BLD07-02935
| FIRE-Final Inspection | 5/27/2008 | 5/27/2008 | 5/27/2008 4:41:42 PM | P | PASS |
|
|
Retested non-functional HVAC unit duct detector for verification of repair, two EM lights at the kitchen and service area okayed, final fire life safety inspection passed.
|
FIR07-00967
| INSP-Final Inspection | 5/23/2008 | 5/27/2008 | 5/27/2008 4:16:25 PM | A | DEFR |
|
|
Scheduled by a contractor via Hello! on 5/23/2008 at 4:19:56 PM. Contact: ###-####.
|
FIR07-00905
| INSP-Sprinkler Rough-in/Hydro | 5/27/2008 | 5/27/2008 | 5/27/2008 3:48:48 PM | P | PART |
|
|
UG fire supply line hydrostatic testing for the new portion of installed pipe and ductile riser completed acceptable.
|
FIR07-00702
| INSP-Sprinkler Rough-in | 5/23/2008 | 5/27/2008 | 5/27/2008 3:46:57 PM | A | FAIL |
|
|
Inspection for cover failed at four locations-see plan set for annotations including missing coverage at one storage room, blocked pendent at a patient room by an adjacent curtain track, one overspaced hanger at the corridor, one head to be relocated due to blockage by a cabinet, mc cable is not to be attatched to sprinkler hanger rods-removed while on site, remainder of ceilings are okay for cover as initialed with today's date.
|
FIR07-00812
| INSP-Sprinkler Rough-in/Hydro | 5/23/2008 | 5/27/2008 | 5/27/2008 2:05:50 PM | P | FAIL |
|
|
Rough-in cover inspection for the office area failed due to decking insulation covering all pipe hanger attatchments-need to expose the work for verification of seismic restraint at the beam clamps-selected one random hanger for inspection and discovered the retaining strap had not been fastened, also missing EQ bracing at the 3" main, noted stairway heads are not cut, need to provide approved plan set.
|
FIR08-00337
| INSP-Final Inspection | 5/23/2008 | 5/27/2008 | 5/27/2008 1:07:24 PM | A | CANC |
|
|
rick - please call 1/2 hr prior to inspection Phone #: ###-#### Overbooked
|
FIR08-00347
| INSP-Final Inspection | 5/27/2008 | 5/27/2008 | 5/27/2008 1:07:01 PM | P | CANC |
|
|
javaer Phone #: ###-#### Overbooked
|
FIR08-00352
| INSP-Final Inspection | 5/23/2008 | 5/27/2008 | 5/27/2008 1:06:43 PM | A | CANC |
|
|
javaer Phone #: ###-#### Overbooked
|
MIS08-00086
| FIR-Conference | 5/23/2008 | 5/27/2008 | 5/27/2008 12:11:01 PM | A | DONE |
|
|
No fire inspection related signatures are required for this project per conversation with J. Sly structural inspector.
|
FIR07-00902
| INSP-Sprinkler Rough-in | 5/27/2008 | 5/27/2008 | 5/27/2008 12:08:46 PM | P | FAIL |
|
|
Pendent head at the mechanical room 2nd floor is obstructed by an adjacent duct-need to relocate as discussed, remainder of hard lid ceilings are good for cover.
|
FIR08-00303
| INSP-Sprinkler Rough-in | 5/23/2008 | 5/27/2008 | 5/27/2008 12:06:50 PM | A | PART |
|
|
See stamped TI plan set for rough-in areas approved for cover at the hard lid ceilings including soffits, noted head placement to be adjusted at the conference room accordian door pocket for proper coverage, ceiling at the electrical closet appears to have been deleted-if so then walls must extend to the bottom of the deck for area separation of sprinklered and non-sprinklered spaces.
|
FIR08-00204
| INSP-Sprinkler Rough-in/Hydro | 5/22/2008 | 5/27/2008 | 5/27/2008 11:31:14 AM | P | CANC |
|
|
ken - underground and tenting for cover Phone #: ###-#### Overbooked
|
FIR08-00039
| INSP-Final Inspection | 5/27/2008 | 5/27/2008 | 5/27/2008 11:24:10 AM | P | NR |
|
|
Permit work is not yet completed for final approval, system riser #2 feeding the east remodel is not in service as rough-in is not finished, riser #1 supervisory and alarm system interconnection tested okay-fire sprinkler install for work completed to date for "phase 1" appears acceptable.
|
BLD08-00359
| FIRE-Final Inspection | 5/27/2008 | 5/27/2008 | 5/27/2008 11:19:27 AM | P | CANC |
|
|
juseppe Phone #: ###-#### Overbooked
|
FIR08-00114
| FIR-Aging Inspection | 5/27/2008 | 5/27/2008 | 5/27/2008 11:10:53 AM | | DONE |
|
|
In progress, pending site inspection request.
|
BLD08-01079
| FIRE-Final Inspection | 5/22/2008 | 5/27/2008 | 5/27/2008 11:09:26 AM | A | CANC |
|
|
Don Phone #: ###-#### Overbooked
|
BLD08-00315
| FIRE-Final Inspection | 5/23/2008 | 5/27/2008 | 5/27/2008 11:05:10 AM | A | CANC |
|
|
jeff Phone #: ###-#### Overbooked
|
FIR08-00168
| INSP-Final Inspection | 5/23/2008 | 5/27/2008 | 5/27/2008 11:04:43 AM | A | FAIL |
|
|
Provide as-built plans indicating field change in notification circut wire guage from 14 to 18, the deletion of a duct smoke detector at the electrical room and the additon of a requried notification appliance at the basement storage room per review notes, provide an updated map at the panel, the door to the FACP room needs signage, sprinkler system riser #2 is not in service to complete testing, annotated areas not finished at this time including phase 2 appliance circut, central station account information is not correct regarding type and description of signals recieved-will need to retest.
|
BLD06-00014
| FIRE-Final Inspection | 5/23/2008 | 5/27/2008 | 5/27/2008 12:00:00 AM | P | CANC |
|
|
russ - fire life safety Phone #: ###-####
|