MIS08-00078
| BLD-Final | 5/27/2008 | 5/27/2008 | 5/28/2008 9:53:05 AM | P | NR |
|
|
pauline Phone #: ###-#### tie downs ok,, need skirting and compliant steps for final,, also trade finals
|
MIS08-00078
| BLD-Conference | 5/27/2008 | 5/27/2008 | 5/27/2008 4:48:30 PM | P | PASS |
|
|
pauline Phone #: ###-#### tie downs ok
|
BLD08-01108
| BLD-Footing | 5/27/2008 | 5/27/2008 | 5/27/2008 4:04:58 PM | P | PART |
|
|
ian Phone #: ###-#### not hillside per Terry
|
BLD07-02308
| BLD-Final | 5/27/2008 | 5/27/2008 | 5/27/2008 3:35:59 PM | P | PART |
|
|
paul Phone #: ###-#### most part looks ok,, need struct engineer to verify as built and look at end wall loading at purlins for ok or add point load support
|
BLD08-01072
| BLD-Final | 5/23/2008 | 5/27/2008 | 5/27/2008 12:19:51 PM | A | PASS |
|
|
martin - roof Phone #: ###-#### appears ok now,, had thunder storm when tear off happened,, had some water damage but insurance is fixing that,, new roof appears ok
|
BLD08-01072
| DOC - Permit Finaled | 5/27/2008 | 5/27/2008 | 5/27/2008 12:18:10 PM | P | PASS |
|
|
|
BLD07-02406
| BLD-Final | 5/21/2008 | 5/27/2008 | 5/27/2008 12:15:30 PM | A | PASS |
|
|
paul Phone #: ###-#### zoning ok'd ,, final ok
|
BLD07-02406
| DOC - Permit Finaled | 5/27/2008 | 5/27/2008 | 5/27/2008 12:14:55 PM | P | PASS |
|
|
|
BLD07-01639
| BLD-Final | 5/23/2008 | 5/27/2008 | 5/27/2008 12:14:38 PM | A | PASS |
|
|
jessica Phone #: ###-####
|
BLD07-01639
| DOC - Permit Finaled | 5/27/2008 | 5/27/2008 | 5/27/2008 12:14:06 PM | P | PASS |
|
|
shell ok,, new T. I. is underway for the core part,, ok
|
BLD07-03064
| BLD-Framing/Rough-in | 5/23/2008 | 5/27/2008 | 5/27/2008 9:09:34 AM | A | NR |
|
|
rob Phone #: ###-#### Need Mech R/I approval.
|