BLD07-02083
| BLD-Framing/Rough-in | 5/26/2009 | 5/27/2009 | 5/27/2009 5:55:32 PM | P | PASS |
|
|
1st floor hallway inspection to pre-rock Phone #: ###-#### Internet Inspection Request from: Bryan Herb
|
BLD09-00753
| BLD-Footing | 5/22/2009 | 5/27/2009 | 5/27/2009 3:58:12 PM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 5/22/2009 at 9:07:54 PM. Contact: ###-####.
|
BLD09-00764
| BLD-Other | 5/27/2009 | 5/27/2009 | 5/27/2009 3:57:47 PM | P | PASS |
|
|
Jon- roof Phone #: ###-#### Removed old sheathing, and replaced with new.
|
BLD07-02082
| BLD-Energy code compliance | 5/26/2009 | 5/27/2009 | 5/27/2009 9:50:46 AM | A | PART |
|
|
1st floor insulation Phone #: ###-#### Internet Inspection Request from: Bryan Herb........OK
|
BLD09-00701
| BLD-Foundation | 5/26/2009 | 5/27/2009 | 5/27/2009 9:16:54 AM | A | PASS |
|
|
Gene Phone #: ###-####
|
ESC09-00251
| General Inspection | 5/27/2009 | 5/27/2009 | 5/27/2009 9:16:31 AM | A | PART |
|
|
Talked to Gene (RP).......Need separate washout pit.....can make a depression in excavated dirt to contain wash. Do not washout in Bldg excavated area.
|