Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR09-00189 INSP-Supply line flush5/21/20095/27/20095/27/2009 4:18:39 PMPFAIL
No water available for the underground flush, preliminary walkthrough for the overhead installation done, riser is not finished at this time.
FIR08-00605 INSP-Sprinkler Rough-in/Hydro5/26/20095/27/20095/27/2009 4:16:25 PMAPART
Inspection for the remainder of tenting work completed satisfactory, overhead work approved for cover, see notice left on site.
BLD08-00942 FIRE-Alarm Testing5/26/20095/27/20095/27/2009 4:14:26 PMAPASS
Fire alarm interconnection at the magnetic door hold opertated correctly.
BLD08-00942 FIRE-Final Inspection5/26/20095/27/20095/27/2009 4:13:22 PMAPASS
Fire life safety inspection completed acceptable for the vanilla permit.
BLD09-00265 FIRE-Final Inspection5/26/20095/27/20095/27/2009 4:12:10 PMAFAIL
Missing the fire extinguisher, one EM light at the front reception area needs repair.
FIR08-00786 INSP-Alarm Testing5/26/20095/27/20095/27/2009 4:10:22 PMAPART
Completed fire alarm testing for areas D and E first floor including the elevator-see plans for annotations. Noted one fire damper at the electrical room adjacent to the riser room which did not operate, retest for items noted yesterday okayed, as-builts for deleted points to be reflected on record drawings.