BLD09-00727
| FIRE-Final Inspection | 5/27/2009 | 5/27/2009 | 5/27/2009 3:59:20 PM | P | PASS |
|
|
life safety passed.
|
FIR09-00133
| INSP-Final Inspection | 5/26/2009 | 5/27/2009 | 5/27/2009 3:29:25 PM | A | FAIL |
|
|
As per my discussion with Tim Frost and Greg Patrick the dry system needs to have the air maintenance device installed as per approved drawing note 15 and 18. The air compressor exceeded the 30 pump up time but Jeremy was going to drop the air pressure down 2 or 3 pounds so that the 30 minute limitation is met. All other items including the fire alarm interconnection is complete.
|
FIR09-00325
| INSP-Final Inspection | 5/27/2009 | 5/27/2009 | 5/27/2009 3:26:58 PM | P | FAIL |
|
|
This project can not be finaled because per the scope of work this project has two phases. Only phase one has been completed. Also the 1 1/2" grooved cply closest to the wall is leaking as is the pipe o let. Also the orange shipping clip is still attached to the new pendant in the restroom.
|
FIR09-00089
| INSP-Final Inspection | 5/21/2009 | 5/27/2009 | 5/27/2009 2:30:09 PM | A | PASS |
|
|
Permit finaled.
|
FIR09-00086
| INSP-Final Inspection | 5/21/2009 | 5/27/2009 | 5/27/2009 2:29:41 PM | A | FAIL |
|
|
All signals were sent out the problem is the lower gate valve tamper switch needs adjusted. I could disable the sprinkler system by shutting the valve and the panel did not recognize the valve as being shut.
|
FIR09-00092
| INSP-Final Inspection | 5/21/2009 | 5/27/2009 | 5/27/2009 1:42:29 PM | A | FAIL |
|
|
We had access to the building but no access to the fire alarm panel. No testing was performed.
|
FIR09-00168
| INSP-Final Inspection | 5/26/2009 | 5/27/2009 | 5/27/2009 1:26:20 PM | A | PASS |
|
|
Permit finaled. The originally submitted AES panel has installed now.
|
FIR08-00832
| INSP-Sprinkler Rough-in/Hydro | 5/26/2009 | 5/27/2009 | 5/27/2009 10:01:50 AM | A | PASS |
|
|
The first floor of Building C sprinkler piping can be covered with sheet rock. The insulation has been installed.
|
FIR09-00276
| INSP-Final Inspection | 5/26/2009 | 5/27/2009 | 5/27/2009 10:01:01 AM | A | PASS |
|
|
Permit finaled
|
FIR09-00107
| FIR-Aging Inspection | 5/27/2009 | 5/27/2009 | 5/27/2009 6:23:50 AM | | NR |
|
|
work is in progress
|