BLD09-00557
| FIRE-Conference | 5/26/2010 | 5/27/2010 | 5/27/2010 3:47:54 PM | A | DONE |
|
|
Trip test on smoke detectors--Matt Phone #: ###-####
|
FIR09-00711
| INSP-Alarm Testing | 5/26/2010 | 5/27/2010 | 5/27/2010 3:37:24 PM | A | DONE |
|
|
See the city approved plans for the initiating devices theat are marked with OK thant have been tested. This included phone line troubles, verification of separate phone lines, duct smoke detectors, pull stations, smoke detectore and heat detectors. Items left to test include the fire sprinkler interconnections, smoke dampers, supervision of the NAC panels, EOL voltage verifications and verifications of a/v sync.. As-builts are also required reflecting actual locations of devices and devices that have been deleted.
|
FIR07-00093
| INSP-Final Inspection | 5/27/2010 | 5/27/2010 | 5/27/2010 3:22:23 PM | P | PASS |
|
|
permit finaled
|
FIR07-00093
| FIR-Aging Inspection | 5/27/2010 | 5/27/2010 | 5/27/2010 3:21:22 PM | | PASS |
|
|
|
FIR06-00947
| INSP-Final Inspection | 5/27/2010 | 5/27/2010 | 5/27/2010 3:19:34 PM | P | PASS |
|
|
Permit finaled
|
FIR06-00947
| FIR-Aging Inspection | 5/27/2010 | 5/27/2010 | 5/27/2010 3:19:12 PM | | DONE |
|
|
|
FIR10-00155
| INSP-Sprinkler Rough-in | 5/26/2010 | 5/27/2010 | 5/27/2010 1:08:25 PM | A | PASS |
|
|
The wood bracing has been covered with dry wall. The items have been corrected. The sprinkler piping can be covered.
|
FIR10-00060
| INSP-Alarm Testing | 5/26/2010 | 5/27/2010 | 5/27/2010 1:00:55 PM | A | CANC |
|
|
Rescheduled for tomorrow morning
|