MEC14-01427
| Rough-in | 5/27/2014 | 5/27/2014 | 5/27/2014 4:45:19 PM | P | FAIL |
|
|
Melissa Phone #: ###-#### - Failed flue pressure test, Need to seal all joints on duct work, Need to install bath room exhaust fans, need to install either a transfer grill or ducted return in bedroom.
|
MEC14-02018
| Final | 5/27/2014 | 5/27/2014 | 5/27/2014 4:19:37 PM | P | PASS |
|
|
Please be in the latest afternoon as possible with a call to Aleks ###-####. Thanks Phone #: ###-#### >> Inspection requested via web by Allie Courter
|
MEC14-01998
| Final | 5/23/2014 | 5/27/2014 | 5/27/2014 4:02:46 PM | P | PASS |
|
|
Please Call Dwight ###-#### @ Jims heating Prior To Inspection, Thank You Phone #: ###-#### >> Inspection requested via web by Manuel Acuna
|
MEC14-01427
| Pressure Test | 5/27/2014 | 5/27/2014 | 5/27/2014 3:41:25 PM | P | PASS |
|
|
Melissa Phone #: ###-#### - 20LB GAS PRESSURE PASS
|
MEC14-01996
| Rough-in | 5/27/2014 | 5/27/2014 | 5/27/2014 3:18:25 PM | P | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Karl Hestekin
|
MEC14-01428
| Final | 5/27/2014 | 5/27/2014 | 5/27/2014 2:35:06 PM | P | PASS |
|
|
>> Inspection requested via web by Konrad Swartz
|
MEC14-00893
| Final | 5/27/2014 | 5/27/2014 | 5/27/2014 2:16:46 PM | P | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Dan Otero -
|
MEC14-01310
| Final | 5/27/2014 | 5/27/2014 | 5/27/2014 2:06:19 PM | P | FAIL |
|
|
Garage Code: 2738 Adam: ###-#### Phone #: ###-#### >> Inspection requested via web by Frank Marturello - need to redue air balance, Total CFM value is to low per manual j.
|
MEC14-01923
| Final | 5/23/2014 | 5/27/2014 | 5/27/2014 11:43:09 AM | A | PASS |
|
|
Customer Name: Lester Rose, ###-#### Phone #: ###-#### >> Inspection requested via web by cheryl shroll
|
MEC14-01899
| Final | 5/23/2014 | 5/27/2014 | 5/27/2014 11:01:42 AM | A | NH |
|
|
Customer Name: Pamela Cook, ###-#### Phone #: ###-#### >> Inspection requested via web by cheryl shroll
|
MEC14-01967
| Rough-in | 5/23/2014 | 5/27/2014 | 5/27/2014 10:21:54 AM | A | FAIL |
|
|
Phone #: ###-#### >> Inspection requested via web by Krista Boss - need to relocate attic access, it is blocked by duct work. Fresh air duct is not the correct size, needs to be 6". need to complete b-vent for water heater, need 1" clearance between insulation shield & b-vent, need 1" clearance to combustable from b-vent. need to pressure test pvc flue.
|
MEC14-01967
| Pressure Test | 5/23/2014 | 5/27/2014 | 5/27/2014 10:18:47 AM | A | NR |
|
|
Phone #: ###-#### >> Inspection requested via web by Krista Boss
|
MEC14-01997
| Final | 5/23/2014 | 5/27/2014 | 5/27/2014 9:51:42 AM | A | PASS |
|
|
Robert Phone #: ###-####
|
MEC14-01962
| Pressure Test | 5/22/2014 | 5/27/2014 | 5/27/2014 9:15:31 AM | A | PASS |
|
|
Adam: ###-#### Phone #: ###-#### >> Inspection requested via web by Frank Marturello - 20LB GAS PRESSURE PASS, 5LB FLUE PRESSURE PASS
|
MEC14-01962
| Rough-in | 5/22/2014 | 5/27/2014 | 5/27/2014 9:14:25 AM | A | PASS |
|
|
Adam: ###-#### Phone #: ###-#### >> Inspection requested via web by Frank Marturello
|