ELE12-00892
| ELE-Aging Inspection | 5/27/2015 | 5/27/2015 | 5/29/2015 2:23:07 PM | | DONE |
|
|
left another message
|
ELE13-01291
| Conference | 5/27/2015 | 5/27/2015 | 5/27/2015 4:10:14 PM | P | DONE |
|
|
Please come to the JUMP trailer to contact Tony Keen about the fire pump controller. Phone #: ###-#### Inspection requested via web by Tom Betty discuss fire pump controller for helx part of bldg. OK to use 400amp rated controller as per meeting with Jeff and Tony
|
ELE15-01529
| Electrical Rough-In | 5/26/2015 | 5/27/2015 | 5/27/2015 2:35:08 PM | P | PASS |
|
|
rough in, Bill Peace is contact at ###-####. Phone #: ###-#### Inspection requested via web by Debby Pierce r/i ceiling ok in IT room. Will look for support of mc longer than 6 foot and support of 4sq box upon return
|
ELE15-01539
| Electrical Rough-In | 5/26/2015 | 5/27/2015 | 5/27/2015 2:02:30 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by John VanZandt r/i kitchen ok
|
ELE15-01085
| Final | 5/26/2015 | 5/27/2015 | 5/27/2015 1:32:22 PM | P | NR |
|
|
Luke is the foreman at Orbit Pizza. His number is ###-####. He should have it unlocked for you. Phone #: ###-#### Inspection requested via web by Paula Gratiot not ready
|
ELE14-03246
| Electrical Rough-In | 5/27/2015 | 5/27/2015 | 5/27/2015 12:58:05 PM | P | NR |
|
|
Levi. Lobby cover. Phone #: ###-#### Inspection requested via web by Sean DeLacy not ready
|
ELE13-03438
| Electrical Rough-In | 5/26/2015 | 5/27/2015 | 5/27/2015 11:41:03 AM | A | PASS |
|
|
Ceiling -Jeremiah Phone #: ###-#### r/i ok training room ceiling in bsmt.
|
ELE14-03488
| Permanent Service | 5/26/2015 | 5/27/2015 | 5/27/2015 10:54:05 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton corrections made p/s u/g n ok
|
ELE15-01183
| Final | 5/26/2015 | 5/27/2015 | 5/27/2015 10:03:44 AM | P | CANC |
|
|
Final inspection. Please contact Alex with any questions Phone #: ###-#### >> Inspection requested via web by Clint Tate Inspection cancelled from web by: Clint Tate
|
ELE15-00169
| Final | 5/26/2015 | 5/27/2015 | 5/27/2015 9:43:41 AM | A | PART |
|
|
Final Inspection, for 2nd floor. Steve Hook is contact. ###-####. thank you. Phone #: ###-#### Inspection requested via web by Debby Pierce final on 1st floor ok, partial final on 2nd floor ok (trac lighting, duct detectors and exterior work and third floor work still going on) signed temporary occupancy for 1st and 2nd floors so they can move in.
|
ELE15-02080
| Permanent Service | 5/26/2015 | 5/27/2015 | 5/27/2015 12:00:00 AM | A | PASS |
|
|
Contact Jon Novak Phone #: ###-#### Inspection requested via web by Cathy Duchek performance testing done as per 230.95 p/s u/g n ok
|
ELE15-02132
| Electrical Rough-In | 5/27/2015 | 5/27/2015 | 5/27/2015 12:00:00 AM | A | PASS |
|
|
2nd floor shaft inspection, 4th floor units inspection. Phone #: ###-#### Inspection requested via web by Rafael Castillo r/i ok vent. shafts in rms. 225,231 and 233
|
ELE15-01183
| Final | 5/26/2015 | 5/27/2015 | 5/26/2015 3:25:05 PM | A | CANC |
|
|
Final inspection. Please contact Alex with any questions ###-#### Phone #: ###-#### >> Inspection requested via web by Clint Tate Inspection cancelled from web by: Clint Tate
|