MEC15-02249
| Final | 5/26/2015 | 5/27/2015 | 5/27/2015 4:42:42 PM | P | PASS |
|
|
Please call Kenny before showing up. Phone #: ###-#### >> Inspection requested via web by James Staley
|
MEC15-02268
| Rough-in | 5/27/2015 | 5/27/2015 | 5/27/2015 4:01:02 PM | P | FAIL |
|
|
call ahead 30 min. for access: Chris ###-#### or Cody: ###-#### Phone #: ###-#### >> Inspection requested via web by Mike Almanza..need to see framing above stand-offs..need to see clearance of flue through roof..clearance from bottom of f/p to ceiling
|
MEC15-02157
| Final | 5/20/2015 | 5/27/2015 | 5/27/2015 3:42:13 PM | P | PASS |
|
|
installer cody ###-#### Phone #: ###-#### >> Inspection requested via web by Dustin Rich
|
MEC15-01058
| Final | 5/26/2015 | 5/27/2015 | 5/27/2015 2:56:02 PM | P | PASS |
|
|
Doak// please call before Phone #: ###-####
|
MEC15-01824
| Final | 5/26/2015 | 5/27/2015 | 5/27/2015 1:50:56 PM | P | FAIL |
|
|
meet chad at job..ladder needs to be set up so it's safe to access the attic...seal all joints in supply...need weather tite whip at a/c...upstairs r/a location...w/h needs to be permitted
|
MEC15-02040
| Final | 5/26/2015 | 5/27/2015 | 5/27/2015 11:34:28 AM | A | PASS |
|
|
Call technician, Jacob, with any questions, comments, or concerns. You can reach Jacob at ###-####. Phone #: ###-#### >> Inspection requested via web by Olivia Hicks
|
MEC15-02202
| Rough-in | 5/26/2015 | 5/27/2015 | 5/27/2015 11:10:46 AM | A | PASS |
|
|
Please do a rough-in and pressure witness inspection. If there are any questions, please call James at ###-####. Thank you. >> Inspection requested via web by 4 Seasons
|
MEC15-02202
| Rough-in | 5/26/2015 | 5/27/2015 | 5/27/2015 11:05:01 AM | A | PASS |
|
|
Please do a rough-in and pressure witness inspection. If there are any questions, please call James at ###-####. Thank you. >> Inspection requested via web by 4 Seasons
|
MEC15-01811
| Pressure Test | 5/26/2015 | 5/27/2015 | 5/27/2015 10:32:19 AM | A | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Randy Hart..20lb gas ok
|
MEC15-01811
| Rough-in | 5/26/2015 | 5/27/2015 | 5/27/2015 10:31:33 AM | A | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Randy Hart
|
MEC15-02261
| Pressure Test | 5/26/2015 | 5/27/2015 | 5/27/2015 10:17:13 AM | P | CANC |
|
|
Homeowner name: Scott Sparks Phone # ###-#### >> Inspection requested via web by Jason Robinson Inspection cancelled from web by: Jason Robinson
|
MEC15-01679
| Final | 5/26/2015 | 5/27/2015 | 5/27/2015 10:14:00 AM | A | PASS |
|
|
>> Inspection requested via web by Konrad Swartz
|
GCM15-00065
| GCM-Final | 5/26/2015 | 5/27/2015 | 5/27/2015 9:52:45 AM | A | FAIL |
|
|
Oleg ###-####...need to install comb-air intake
|
MEC15-02246
| Final | 5/26/2015 | 5/27/2015 | 5/27/2015 9:20:04 AM | A | PASS |
|
|
This was meant as a final. Thanks Phone #: ###-#### >> Inspection requested via web by Allie Courter
|
MEC15-02062
| Rough-in | 5/26/2015 | 5/27/2015 | 5/27/2015 8:02:56 AM | P | CANC |
|
|
Please call the office when on way out to the jobsite. Phone #: ###-#### >> Inspection requested via web by Cassandra Koch Inspection cancelled from web by: Cassandra Koch
|