BLD14-01937
| BLD-Energy code compliance | 5/27/2015 | 5/27/2015 | 5/27/2015 4:01:52 PM | P | NR |
|
|
Corridor Fire caulking and grid inspection Phone #: ###-#### Inspection requested via web by Julian Lopez. 2nd floor, west and northcorridors, complete fire caulking and provide UL rated assembly for low voltage exiting the smurf tubes and steel conduits.
|
BLD13-03405
| BLD-Framing/Rough-in | 5/27/2015 | 5/27/2015 | 5/27/2015 3:59:19 PM | P | PASS |
|
|
Tower 1, Two hour mech shaft Phone #: ###-#### Inspection requested via web by Tim Toups. Tower 1 mech shaft to bottom of roof deck ok for cover. Tower 4, floors 1 to 4 mech. shaft next to elvator, corridor side to bottom of floor decks ok.
|
BLD15-00953
| BLD-Final | 5/27/2015 | 5/27/2015 | 5/27/2015 3:44:49 PM | P | PASS |
|
|
Doug Phone #: ###-####
|
BLD15-00953
| DOC - Permit Finaled | 5/27/2015 | 5/27/2015 | 5/27/2015 3:44:42 PM | P | PASS |
|
|
|
BLD15-00953
| DOC - Permit Finaled | 5/27/2015 | 5/27/2015 | 5/27/2015 3:43:41 PM | P | PASS |
|
|
|
ESC15-00172
| Site Preparation | 5/27/2015 | 5/27/2015 | 5/27/2015 2:45:53 PM | A | PASS |
|
|
|
BLD15-00492
| BLD-Footing | 5/26/2015 | 5/27/2015 | 5/27/2015 2:45:29 PM | P | PASS |
|
|
Dane Phone #: ###-####
|
BLD15-01716
| BLD-Final | 5/27/2015 | 5/27/2015 | 5/27/2015 2:31:22 PM | P | PASS |
|
|
Please call Dan 15 Min. before inspection Phone #: ###-#### Inspection requested via web by Dan Elser
|
BLD13-03584
| BLD-Framing/Rough-in | 5/26/2015 | 5/27/2015 | 5/27/2015 2:06:36 PM | P | PASS |
|
|
rough frame inspection Phone #: ###-#### Inspection requested via web by Mel Rawlinson
|
BLD15-00345
| BLD-Final | 5/27/2015 | 5/27/2015 | 5/27/2015 1:42:57 PM | P | PASS |
|
|
Brett Phone #: ###-####
|
BLD15-00345
| DOC - Permit Finaled | 5/27/2015 | 5/27/2015 | 5/27/2015 1:42:49 PM | P | PASS |
|
|
|
BLD14-03379
| BLD-Framing/Rough-in | 5/26/2015 | 5/27/2015 | 5/27/2015 10:29:19 AM | A | NR |
|
|
Call brian prior Phone #: ###-#### Inspection requested via web by Brian Stark
|
BLD15-00982
| BLD-Framing/Rough-in | 5/22/2015 | 5/27/2015 | 5/27/2015 9:49:01 AM | A | PASS |
|
|
Early afternoon - MJ Phone #: ###-####. INterior steel stud framed walls for restroom demissing wall to create an additional restroom and knee wall in reception area.
|
BLD14-01465
| BLD-Framing/Rough-in | 5/26/2015 | 5/27/2015 | 5/27/2015 9:25:08 AM | A | NR |
|
|
Doug Phone #: ###-####. Provide approved plans. Framing not completed.
|
BLD15-01077
| BLD-Final | 5/26/2015 | 5/27/2015 | 5/27/2015 9:12:08 AM | A | PASS |
|
|
Doug Phone #: ###-####. Ok for perm occ.
|