| INSP-Sprinkler Rough-in/Hydro | 5/27/2015 | 5/27/2015 | 5/27/2015 11:31:16 AM | A | PASS |
|
|
FSUG hydrotest from city connection to A/S BOR - 200 psi @ 2 hours - PASSED
|
FIR14-00071
| INSP-Sprinkler Rough-in/Hydro | 5/27/2015 | 5/27/2015 | 5/27/2015 11:29:29 AM | A | PASS |
|
|
FSUG Hydrotest - 200 psi @ 2 hours - PASSED NOTE: Siesmic clearance around U/G stub up in riser room still needed, as noted during flush test,
|
FIR14-00068
| INSP-Sprinkler Rough-in/Hydro | 5/26/2015 | 5/27/2015 | 5/27/2015 11:22:29 AM | A | PASS |
|
|
Hydrotest of FSUG from city connection to pump room stub up. 200 psi at 2 hours - PASSED
|
FIR14-00070
| INSP-Sprinkler Rough-in/Hydro | 5/26/2015 | 5/27/2015 | 5/27/2015 11:19:59 AM | A | CANC |
|
|
Hydrotest of FSUG supply lie=ne from city connection to BOR - 200 psi at 2 hours - PASSED.
|
FIR14-00071
| INSP-Sprinkler Rough-in/Hydro | 5/26/2015 | 5/27/2015 | 5/27/2015 11:17:48 AM | A | CANC |
|
|
Hydrotest of FSUG supply line from city connection to BOR - 200 psi at 2hours - PASSED NOTE: Siesmic clerance still needed around stub up through concrete floor slab in riser room - noted at system flush test.
|