Inspections for the day of: Wednesday, May 27, 2015.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorThomas Walsh
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR14-00070 INSP-Sprinkler Rough-in/Hydro5/27/20155/27/20155/27/2015 11:31:16 AMAPASS
FSUG hydrotest from city connection to A/S BOR - 200 psi @ 2 hours - PASSED
FIR14-00071 INSP-Sprinkler Rough-in/Hydro5/27/20155/27/20155/27/2015 11:29:29 AMAPASS
FSUG Hydrotest - 200 psi @ 2 hours - PASSED
NOTE: Siesmic clearance around U/G stub up in riser room still needed, as noted during flush test,
FIR14-00068 INSP-Sprinkler Rough-in/Hydro5/26/20155/27/20155/27/2015 11:22:29 AMAPASS
Hydrotest of FSUG from city connection to pump room stub up. 200 psi at 2 hours - PASSED
FIR14-00070 INSP-Sprinkler Rough-in/Hydro5/26/20155/27/20155/27/2015 11:19:59 AMACANC
Hydrotest of FSUG supply lie=ne from city connection to BOR - 200 psi at 2 hours - PASSED.
FIR14-00071 INSP-Sprinkler Rough-in/Hydro5/26/20155/27/20155/27/2015 11:17:48 AMACANC
Hydrotest of FSUG supply line from city connection to BOR - 200 psi at 2hours - PASSED
NOTE: Siesmic clerance still needed around stub up through concrete floor slab in riser room - noted at system flush test.