FIR15-00247
| INSP-Final Inspection | 5/27/2015 | 5/27/2015 | 5/28/2015 9:35:41 AM | P | FAIL |
|
|
Contractor did not have city aprroved/stamped drawings on site.
|
FIR15-00208
| INSP-Sprinkler Rough-in | 5/27/2015 | 5/27/2015 | 5/27/2015 3:07:29 PM | P | PASS |
|
|
Met Don F. with Treasure Valley Fire, verified area's that was wanting to be covered. Notated the on site approved drawings area's allowed for cover.
|
FIR15-00039
| INSP-Sprinkler Rough-in/Hydro | 5/27/2015 | 5/27/2015 | 5/27/2015 12:50:05 PM | P | PASS |
|
|
Underground hydrostatic test complete/passed.
|
FIR14-00783
| INSP-Supply line flush | 5/26/2015 | 5/27/2015 | 5/27/2015 10:40:41 AM | A | PASS |
|
|
Underground flush complete.
|
FIR15-00112
| INSP-Sprinkler Rough-in | 5/26/2015 | 5/27/2015 | 5/27/2015 10:39:24 AM | A | PART |
|
|
Notated the onsite city approved plans for area okay to cover in basement level. End of line restraints not installed, will need to verify install on future inspection.
|
FIR15-00298
| INSP-Sprinkler Rough-in/Hydro | 5/26/2015 | 5/27/2015 | 5/27/2015 10:35:57 AM | A | PASS |
|
|
Hydrostatic test for 1st floor, 2nd floor and FDC passed.
|
FIR15-00317
| INSP-Sprinkler Rough-in/Hydro | 5/26/2015 | 5/27/2015 | 5/27/2015 10:34:32 AM | A | PASS |
|
|
Hydrostatic test for 1st floor, 2nd floor and FDC passed
|
FIR15-00317
| INSP-Sprinkler Rough-in | 5/26/2015 | 5/27/2015 | 5/27/2015 10:32:44 AM | A | PASS |
|
|
Rough in complete for cover
|