ESC13-00690
| Complaint Inspection | 5/27/2015 | 5/27/2015 | 5/27/2015 2:28:00 PM | P | PART |
|
|
BMP's in place, but it appears that the significant rainstorm that came through last night overwhelmed some of the new grass that's growning. Also, the Rock Retaining walls on both homes are Eroding away (Not Constructed Correctly). Roof Drains are also causing issues. I contacted Bob to disclose the complaint and to place waddles along the hillside within the gully's to slow the velocity of precipitation. He stated he will be up this afternoon to rack out the gullys, place new seed and install waddles on all lots.
|
ESC13-00707
| Complaint Inspection | 5/27/2015 | 5/27/2015 | 5/27/2015 2:27:47 PM | P | PART |
|
|
BMP's in place, but it appears that the significant rainstorm that came through last night overwhelmed some of the new grass that's growning. Also, the Rock Retaining walls on both homes are Eroding away (Not Constructed Correctly). Roof Drains are also causing issues. I contacted Bob to disclose the complaint and to place waddles along the hillside within the gully's to slow the velocity of precipitation. He stated he will be up this afternoon to rack out the gullys, place new seed and install waddles on all lots.
|
ESC13-00520
| Complaint Inspection | 5/27/2015 | 5/27/2015 | 5/27/2015 2:27:32 PM | P | PART |
|
|
BMP's in place, but it appears that the significant rainstorm that came through last night overwhelmed some of the new grass that's growning. Also, the Rock Retaining walls on both homes are Eroding away (Not Constructed Correctly). Roof Drains are also causing issues. I contacted Bob to disclose the complaint and to place waddles along the hillside within the gully's to slow the velocity of precipitation. He stated he will be up this afternoon to rack out the gullys, place new seed and install waddles on all lots.
|
ESC15-00582
| Site Preparation | 5/27/2015 | 5/27/2015 | 5/27/2015 12:54:30 PM | P | PASS |
|
|
Clint Phone #: ###-#### Permit Posted: Flat Lot, no ESC issues at this time.
|
ESC14-00135
| General Inspection | 5/27/2015 | 5/27/2015 | 5/27/2015 11:32:54 AM | | PART |
|
|
Sidewalks need to be swept off, and also the curb up top in the culdisac. Drop Inlet protection throughout Birdsong needs to be replaced
|
ESC14-00284
| General Inspection | 5/27/2015 | 5/27/2015 | 5/27/2015 9:41:09 AM | | PASS |
|
|
|
ESC14-00943
| General Inspection | 5/27/2015 | 5/27/2015 | 5/27/2015 9:34:05 AM | | PASS |
|
|
WIP: No ESC issues at this time
|
ESC13-00755
| General Inspection | 5/27/2015 | 5/27/2015 | 5/27/2015 9:11:02 AM | | PASS |
|
|
WIP: landscaping is occuring around completed buildings and stormwater retention ponds. No trackout leaving the site at this time
|
ESC13-00684
| General Inspection | 5/27/2015 | 5/27/2015 | 5/27/2015 9:01:19 AM | | FAIL |
|
|
Roads and sidewalks/curbs needs swept or stop work order shall be placed on entire site until corrections are made. 2nd warning
|