FIR15-00909
| INSP-Sprinkler Rough-in | 5/26/2016 | 5/27/2016 | 5/27/2016 2:17:09 PM | A | PASS |
|
|
An additional lenght of piping is ok for cover. Tie-in to the Suez tap is taking place.
|
BLD16-01719
| FIRE-Final Inspection | 5/27/2016 | 5/27/2016 | 5/27/2016 2:14:02 PM | P | FAIL |
|
|
Provide separate permit from the Boise Fire Dept. as per review note #1, install and provide testing of the "Emergency Off" switch per note #2, Provide signage per review note #3, Provide fire extingusher per review note #4 and approved plans, Provide vehicle impact protection per review note #5 (see IFC 312 #2, #3, #4), provide signage per IFC 5003.5
Shawn Phone #: ###-####
|
FIR16-00303
| INSP-Final Inspection | 5/27/2016 | 5/27/2016 | 5/27/2016 1:34:48 PM | P | PASS |
|
|
Permit finaled
|
FIR16-00335
| INSP-Supply line flush | 5/26/2016 | 5/27/2016 | 5/27/2016 1:31:46 PM | A | PASS |
|
|
Underground supply line hydro tests passed
|
FIR16-00348
| INSP-Sprinkler Rough-in | 5/27/2016 | 5/27/2016 | 5/27/2016 1:12:51 PM | P | PASS |
|
|
rough-in passed. piping can be covered.
|
BLD16-00591
| FIRE-Final Inspection | 5/27/2016 | 5/27/2016 | 5/27/2016 1:09:53 PM | P | FAIL |
|
|
See the city approved plans for corrections noted that include removing the manual flush bolts from the inactive leaf of the main exit door and providing automatic flush bolts, removing the keyed deadbolt from the existing office exterior exit door, providing an exit light and emergency lighting above the exxterior exit door, and removing the two thumbturn deadbolts from the interior office doors. I discussed with the general contractor that the round knobs on the interior door may need to be replaced at the building inspector discression
|
BLD16-00427
| FIRE-Final Inspection | 5/26/2016 | 5/27/2016 | 5/27/2016 11:10:00 AM | P | PASS |
|
|
life safety passed
|
BLD16-01451
| FIRE-Final Inspection | 5/26/2016 | 5/27/2016 | 5/27/2016 10:58:53 AM | A | PASS |
|
|
Life safety passed
|
FIR16-00355
| INSP-Final Inspection | 5/26/2016 | 5/27/2016 | 5/27/2016 10:56:34 AM | A | PASS |
|
|
Hood suppression system functioned correctly. Manual pull station position approved by the fire dept.
|
BLD16-00268
| FIRE-Final Inspection | 5/27/2016 | 5/27/2016 | 5/27/2016 9:48:51 AM | P | PART |
|
|
Life safety for phase 1 passed
|
BLD16-00268
| FIRE-Alarm Testing | 5/27/2016 | 5/27/2016 | 5/27/2016 9:25:55 AM | A | PART |
|
|
Phase 1 life safety passed.
|
NAF16-00013
| INSP-Final | 5/26/2016 | 5/27/2016 | 5/27/2016 8:44:19 AM | A | PASS |
|
|
Permit finaled
|
NAF16-00042
| INSP-Final | 5/26/2016 | 5/27/2016 | 5/27/2016 8:43:48 AM | A | PASS |
|
|
Permit finaled
|
FIR16-00239
| INSP-Sprinkler Rough-in | 5/26/2016 | 5/27/2016 | 5/27/2016 8:06:29 AM | A | PASS |
|
|
Sprinkler work is complete in the COnference Room.
|
BLD16-00699
| FIRE-Final Inspection | 5/26/2016 | 5/27/2016 | 5/27/2016 8:04:47 AM | A | PART |
|
|
Life safety passed in Open Work Area 129 and 121 and the Conference Room.
|
BLD16-00170
| FIRE-Final Inspection | 5/27/2016 | 5/27/2016 | 5/27/2016 12:00:00 AM | P | DONE |
|
|
|