Inspections for the day of: Wednesday, May 27, 2020.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-01682 General Inspection5/27/20205/27/20205/28/2020 11:04:35 AM PASS
Site still needs landscaping.
ESC19-01473 General Inspection5/22/20205/27/20205/28/2020 10:07:10 AMAFAIL
follow up on concrete washout stabilized entrance and trackout sweep up
Nothing has been done.
ESC19-00841 Aging Inspection5/27/20205/27/20205/28/2020 9:44:54 AM CANC
ESC18-01171 General Inspection5/27/20205/27/20205/27/2020 1:25:17 PM CANC
ESC18-01171 DOC - Permit Finaled5/27/20205/27/20205/27/2020 1:25:10 PMPPASS
ESC19-00254 General Inspection5/27/20205/27/20205/27/2020 1:19:37 PM PASS
Site is kept clean, fenced in and buffer in rear. Never has had an issue.
ESC19-00754 Aging Inspection5/27/20205/27/20205/27/2020 11:57:45 AM CANC
ESC19-00754 DOC - Permit Finaled5/27/20205/27/20205/27/2020 11:57:38 AMPPASS
expired. Talked to home owner and they are unsure if they will do garage. Will need to reopen permit if they decide to work.
ESC18-01632 DOC - Permit Finaled5/27/20205/27/20205/27/2020 11:43:08 AMPPASS
ESC18-01635 Site Final5/22/20205/27/20205/27/2020 11:42:45 AMPPASS
ESC19-01673 General Inspection5/27/20205/27/20205/27/2020 11:27:31 AMPPASS
Riverside inc on side drilling a well, they have a small pond recirculating for their system.
Site grading work is completed, still lots of bare dirt. Pond has water, flatbed at site with many 1 ton sacks of bentonite.
ESC19-01053 General Inspection5/27/20205/27/20205/27/2020 10:46:43 AMPPASS
Clinic is about completed, landscapers finishing up.
Met with foreman while on site and they will be doing the next projects. Owners undecided if they will pave remaining lots or wait until next year. Lots of empty lots, rain left a nice crust should be ok if not driven on. Will allow weeds to grow on empty lots.
ESC20-00343 General Inspection5/27/20205/27/20205/27/2020 10:15:23 AMPPASS
Curbing work completed. Site iss prepped for paving, all below surrounding grade. Landscapers on site working on parking islands and perimeters.
MTI is on site testing road bed before paving.
ESC19-01727 General Inspection5/27/20205/27/20205/27/2020 9:54:36 AMPPASS
North of lake hazel.
Road and sidewalk completed. No activity, starting to get weed coverage.
ESC19-01518 General Inspection5/27/20205/27/20205/27/2020 9:46:08 AMPPASS
South of lake hazel phase.
Only homes have been on silver spur. Power enterprise on site. Streets and sidewalks clean. Hayden job trailer has been moved to east side of site. Road paved through site.
Some large stockpiles in new phase, no current dust issues.
ESC19-00359 Aging Inspection5/27/20205/27/20205/27/2020 8:39:26 AM CANC
ESC19-00359 DOC - Permit Finaled5/27/20205/27/20205/27/2020 8:39:21 AMPPASS
expired. No bld activity since 8-22-19