BLD02-00744
| BLD-Framing/Rough-in | 5/24/2002 | 5/28/2002 | 5/28/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 05/24/2002 at 13:24:19. Contact: ###-####. C/N posted--air seal and a pass pressure test needed prior to granting ok to insulate. 5/28/2002 9:44:30 AM
|
MEC02-01166
| Rough-in | 5/24/2002 | 5/28/2002 | 5/28/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/24/2002 at 13:53:18. Contact: ###-####.
|
MEC02-01166
| Pressure Test | 5/24/2002 | 5/28/2002 | 5/28/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 05/24/2002 at 13:53:43. Contact: ###-####. Guage read only 13 lbs at least 20 lbs required to be a valid test. 5/28/2002 9:16:57 AM
|
BLD02-00884
| BLD-Footing | 5/28/2002 | 5/28/2002 | 5/28/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 05/28/2002 at 06:55:10. Contact: ###-####. wip 5/28/2002 11:15:02 AM
|
MEC02-00944
| Final | 5/28/2002 | 5/28/2002 | 5/28/2002 12:00:00 AM | P | FAIL |
|
|
leo ###-#### C/N posted 5/28/2002 3:36:42 PM
|
BLD02-01083
| BLD-Foundation | 5/28/2002 | 5/28/2002 | 5/28/2002 12:00:00 AM | P | PART |
|
|
###-#### chuck wip--35% ready 5/28/2002 3:36:58 PM
|
MEC02-01430
| Pressure Test | 5/28/2002 | 5/28/2002 | 5/28/2002 12:00:00 AM | P | PASS |
|
|
###-#### merle Pressure only--r.i mechanical not ready. 5/28/2002 1:35:46 PM
|
BLD02-00577
| BLD-Framing/Rough-in | 5/28/2002 | 5/28/2002 | 5/28/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 05/28/2002 at 09:36:50. Contact: ###-####. C/N --ok to insulate. 5/28/2002 3:28:45 PM
|
MEC02-01166
| Pressure Test | 5/28/2002 | 5/28/2002 | 5/28/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 05/28/2002 at 09:37:47. Contact: ###-####.
|
BLD02-00744
| BLD-Framing/Rough-in | 5/28/2002 | 5/28/2002 | 5/28/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 05/28/2002 at 10:06:49. Contact: ###-####. Ok to insulate. 5/28/2002 2:17:18 PM
|