Inspections for the day of: Tuesday, May 28, 2002.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-01237 BLD-Footing5/24/20025/28/20025/28/2002 12:00:00 AMAPART
###-#### 75% of ftg complete the other will be poured later 5/28/2002 10:27:22 AM
BLD02-01203 BLD-Framing/Rough-in5/24/20025/28/20025/28/2002 12:00:00 AMAPASS
fr insp - drew ###-#### ok to cover 5/28/2002 11:22:18 AM
BLD01-02961 BLD-Foundation5/24/20025/28/20025/28/2002 12:00:00 AMAPART
BRENT ###-#### south side bld g ok to pour 5/28/2002 10:55:06 AM
BLD02-01119 BLD-Foundation5/24/20025/28/20025/28/2002 12:00:00 AMAPART
###-#### SCOTT work in progess 5/28/2002 10:03:40 AM
BLD02-01229 BLD-Footing5/24/20025/28/20025/28/2002 12:00:00 AMAPASS
###-#### dan
BLD02-00067 BLD-Framing/Rough-in5/28/20025/28/20025/28/2002 12:00:00 AMAPASS
ok to cover ext and int
BLD02-01128 BLD-Footing5/28/20025/28/20025/28/2002 12:00:00 AMPPART
ft randy- ###-####--call 1st before insp
BLD02-00934 BLD-Wall cover5/28/20025/28/20025/28/2002 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 05/28/2002 at 08:39:44. Contact: ###-####. hold downs in wrong locations nailing on panels needs tobe added 5/28/2002 2:43:06 PM
BLD02-00757 BLD-Framing/Rough-in5/28/20025/28/20025/28/2002 12:00:00 AMPFAIL
shane ###-#### this inspection was for ext walls on the east north and west sides only still needs to finish bolting base to foundation and fire blocking on furred out walls 5/28/2002 2:19:22 PM
BLD02-00687 BLD-Framing/Rough-in5/28/20025/28/20025/28/2002 12:00:00 AMPPASS
shane ###-####
BLD02-01154 BLD-Foundation5/28/20025/28/20025/28/2002 12:00:00 AMPNR
###-####