BLD02-01237
| BLD-Footing | 5/24/2002 | 5/28/2002 | 5/28/2002 12:00:00 AM | A | PART |
|
|
###-#### 75% of ftg complete the other will be poured later 5/28/2002 10:27:22 AM
|
BLD02-01203
| BLD-Framing/Rough-in | 5/24/2002 | 5/28/2002 | 5/28/2002 12:00:00 AM | A | PASS |
|
|
fr insp - drew ###-#### ok to cover 5/28/2002 11:22:18 AM
|
BLD01-02961
| BLD-Foundation | 5/24/2002 | 5/28/2002 | 5/28/2002 12:00:00 AM | A | PART |
|
|
BRENT ###-#### south side bld g ok to pour 5/28/2002 10:55:06 AM
|
BLD02-01119
| BLD-Foundation | 5/24/2002 | 5/28/2002 | 5/28/2002 12:00:00 AM | A | PART |
|
|
###-#### SCOTT work in progess 5/28/2002 10:03:40 AM
|
BLD02-01229
| BLD-Footing | 5/24/2002 | 5/28/2002 | 5/28/2002 12:00:00 AM | A | PASS |
|
|
###-#### dan
|
BLD02-00067
| BLD-Framing/Rough-in | 5/28/2002 | 5/28/2002 | 5/28/2002 12:00:00 AM | A | PASS |
|
|
ok to cover ext and int
|
BLD02-01128
| BLD-Footing | 5/28/2002 | 5/28/2002 | 5/28/2002 12:00:00 AM | P | PART |
|
|
ft randy- ###-####--call 1st before insp
|
BLD02-00934
| BLD-Wall cover | 5/28/2002 | 5/28/2002 | 5/28/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 05/28/2002 at 08:39:44. Contact: ###-####. hold downs in wrong locations nailing on panels needs tobe added 5/28/2002 2:43:06 PM
|
BLD02-00757
| BLD-Framing/Rough-in | 5/28/2002 | 5/28/2002 | 5/28/2002 12:00:00 AM | P | FAIL |
|
|
shane ###-#### this inspection was for ext walls on the east north and west sides only still needs to finish bolting base to foundation and fire blocking on furred out walls 5/28/2002 2:19:22 PM
|
BLD02-00687
| BLD-Framing/Rough-in | 5/28/2002 | 5/28/2002 | 5/28/2002 12:00:00 AM | P | PASS |
|
|
shane ###-####
|
BLD02-01154
| BLD-Foundation | 5/28/2002 | 5/28/2002 | 5/28/2002 12:00:00 AM | P | NR |
|
|
###-####
|