BLD02-02182
| BLD-Aging Inspection | 5/28/2003 | 5/28/2003 | 5/28/2003 12:00:00 AM | | PASS |
|
|
wip 5/28/2003 10:47:43 AM
|
BLD02-02181
| BLD-Aging Inspection | 5/28/2003 | 5/28/2003 | 5/28/2003 12:00:00 AM | | PASS |
|
|
wip 5/28/2003 10:47:54 AM
|
BLD02-02687
| BLD-Framing/Rough-in | 5/27/2003 | 5/28/2003 | 5/28/2003 12:00:00 AM | A | FAIL |
|
|
###-####, c/n firestops, add backing studs at corridor...seal "tops" of chases, provide arch's detail for susp. lids & shaft wall 5/28/2003 12:17:35 PM
|
BLD02-02890
| BLD-Conference | 5/27/2003 | 5/28/2003 | 5/28/2003 12:00:00 AM | A | PASS |
|
|
talked on phone Wip on project 5/28/2003 10:45:55 AM
|
BLD02-00370
| BLD-Framing/Rough-in | 5/27/2003 | 5/28/2003 | 5/28/2003 12:00:00 AM | A | PART |
|
|
randy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...wip, 4hr wall ok 5/28/2003 12:19:56 PM
|
MIS02-00179
| BLD-Conference | 5/28/2003 | 5/28/2003 | 5/28/2003 12:00:00 AM | A | PASS |
|
|
left n&o ...2nd notice, spoke w/ Scott, landlord (at Main St. Motors) make arrangements by 6-20 -03 5/28/2003 11:48:56 AM
|
BLD03-00642
| BLD-Framing/Rough-in | 5/28/2003 | 5/28/2003 | 5/28/2003 12:00:00 AM | A | FAIL |
|
|
see c/n w/ shell bld02 -02687
|
BLD02-00369
| BLD-Framing/Rough-in | 5/28/2003 | 5/28/2003 | 5/28/2003 12:00:00 AM | P | FAIL |
|
|
c/n, need detail/assy for pipes at 3hr deck....cast to pvc ok?? detail shear walls: straps, blots, membrane penetrations....etc. Need eng's observation reports to date. 5/28/2003 2:59:20 PM
|
BLD99-03154
| BLD-Final | 5/22/2003 | 5/28/2003 | 5/28/2003 12:00:00 AM | P | CANC |
|
|
need fire, etc. 6/3/2003 11:28:46 AM
|
BLD00-03729
| BLD-Other | 5/27/2003 | 5/28/2003 | 5/28/2003 12:00:00 AM | P | PASS |
|
|
tom; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...south corridor area ok to use...phase3 5/28/2003 4:37:38 PM
|
BLD02-00199
| BLD-Footing | 5/27/2003 | 5/28/2003 | 5/28/2003 12:00:00 AM | P | PART |
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore mti onsite 5/28/2003 3:10:23 PM
|
BLD02-00199
| BLD-Foundation | 5/27/2003 | 5/28/2003 | 5/28/2003 12:00:00 AM | P | PART |
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...south wall, mti onsite...pend reports 5/28/2003 3:10:01 PM
|
BLD03-00315
| BLD-Framing/Rough-in | 5/28/2003 | 5/28/2003 | 5/28/2003 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 5/28/2003 at 7:44:52 AM. Contact: ###-####.
|
BLD03-00467
| BLD-Framing/Rough-in | 5/28/2003 | 5/28/2003 | 5/28/2003 12:00:00 AM | P | PART |
|
|
joe ceiling grid; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...grid at storeroom ok... 5/28/2003 1:59:22 PM
|