Inspections for the day of: Wednesday, May 28, 2003.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD03-00673 BLD-Final5/27/20035/28/20035/28/2003 12:00:00 AMAPART
gil; Phone #: ###-#### Internet Inspection Request from: Annette Moore. Ok temp oc pending ele perm and c/n for lever hardware at breakroom sink,pull out ele boxes for reach ranges and have water cooler on site. 5/28/2003 12:52:13 PM
BLD02-02620 BLD-Final5/27/20035/28/20035/28/2003 12:00:00 AMAPART
###-####fire/life safety has approved but job card requested public works and zoning also approve talked with contractor about the above. 5/28/2003 12:39:56 PM 5/28/2003 12:42:18 PM
BLD02-02435 BLD-Framing/Rough-in5/27/20035/28/20035/28/2003 12:00:00 AMAPART
2nd floor ok pending fire stoping of plumbing in floor of restrooms and , also posted a c/n for columns in 2hr walls. 5/29/2003 12:49:18 PM
BLD02-01073 BLD-Wall cover5/27/20035/28/20035/28/2003 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 5/27/2003 at 4:55:31 PM. Contact: ###-####.Adde 5/28/2003 4:49:15 PM added more screws to lid. still need gas log inspection. 5/28/2003 4:49:57 PM
BLD02-02999 BLD-Framing/Rough-in5/27/20035/28/20035/28/2003 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 5/27/2003 at 4:56:02 PM. Contact: ###-####. I have posted a c/n engineer to address column connections at opposite hold downs called and talked with him. 5/28/2003 11:40:59 AM
BLD03-00174 BLD-Framing/Rough-in5/28/20035/28/20035/28/2003 12:00:00 AMPPART
russ; Phone #: ###-#### Internet Inspection Request from: Annette Moore. Roof ok. 5/29/2003 12:46:08 PM
BLD02-02474 BLD-Framing/Rough-in5/28/20035/28/20035/28/2003 12:00:00 AMPNR
cameron; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD03-00528 BLD-Foundation5/28/20035/28/20035/28/2003 12:00:00 AMPPART
###-#### Work in progress, They have presented a letter from the soils engineer after excavation, soil is acceptable. Done by MTI. 5/28/2003 4:36:53 PM
BLD03-00654 BLD-Final5/27/20035/28/20035/28/2003 12:00:00 AMPNR
###-####. needs fire life safety. 5/28/2003 4:29:29 PM
BLD03-00335 BLD-Framing/Rough-in5/27/20035/28/20035/28/2003 12:00:00 AMPPASS
###-####