Inspections for the day of: Wednesday, May 28, 2003.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-03729 FIRE-Final Inspection5/27/20035/28/20035/28/2003 12:00:00 AMAPART
tom; Phone #: ###-#### I witnessed the testing of the fire alarm in the west basement, phase three one the plans. Contractor stated that it is actually phase 4. All devices worked except for the horn in the mechanical room. The test included the tripping of the dry system for the fellowship hall. Trip time was only about 10 seconds. This area is OK to occupy 5/28/2003 2:33:03 PM
BLD03-00654 FIRE-Final Inspection5/27/20035/28/20035/28/2003 12:00:00 AMAFAIL
###-#### A fire alarm upgrade agreement is in the works and is required before a sign off. All other life safety items OK. Per Dixie and Alan a duct smoke detector is not required on the hvac unit therefore the one that happened to get installed is not required to be connected to the fire alarm system. 5/28/2003 2:56:02 PM
FIR03-00238 INSP-Sprinkler Rough-in/Hydro5/27/20035/28/20035/28/2003 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 5/27/2003 at 1:47:38 PM.
BLD03-00037 FIRE-Final Inspection5/27/20035/28/20035/28/2003 12:00:00 AMAFAIL
CLINT; Phone #: ###-#### Inspection was set up for 1:00. I waited 30 minutes. Mechanical contractor did not show up. Inspection failed 5/28/2003 1:37:55 PM
BLD99-03154 FIRE-Final Inspection5/22/20035/28/20035/28/2003 12:00:00 AMAFAIL
I stopped at the job site and was told to contact Bill Marcolina who was not in. I left site and called back later and was put on hold for an extended lenght of time before I hung up. No inspection done 5/28/2003 10:23:58 AM
FIR02-00005 INSP-Sprinkler Rough-in/Hydro5/28/20035/28/20035/28/2003 12:00:00 AMPPASS
sam; Phone #: ###-#### Hydro test for dry system area "B" is ok 5/28/2003 4:00:07 PM
FIR01-00399 INSP-Final Inspection5/28/20035/28/20035/28/2003 12:00:00 AMPPART
I witnessed the testing of the fire alarm in the west basement, phase three one the plans. Contractor stated that it is actually phase 4. All devices worked except for the horn in the mechanical room. The test included the tripping of the dry system for the fellowship hall. Trip time was only about 10 seconds. This area is OK to occupy
FIR01-00462 INSP-Final Inspection5/28/20035/28/20035/28/2003 12:00:00 AMPPART
I witnessed the testing of the fire alarm in the west basement, phase three one the plans. Contractor stated that it is actually phase 4. All devices worked except for the horn in the mechanical room. The test included the tripping of the dry system for the fellowship hall. Trip time was only about 10 seconds. This area is OK to occupy
FIR02-00432 INSP-Final Inspection5/23/20035/28/20035/27/2003 4:20:36 PMPCANC
Scheduled by a contractor via Hello! on 5/23/2003 at 2:41:24 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on May 27 2003 4:20PM.