FIR07-00830
| INSP-Alarm Testing | 5/23/2008 | 5/28/2008 | 5/29/2008 1:45:43 PM | A | PART |
|
|
See approved plans for areas inspected today, noted smoke detectors at six patient rooms to be relocated, construction is still underway at some locations.KR
|
FIR07-00086
| INSP-Sprinkler Rough-in | 5/27/2008 | 5/28/2008 | 5/28/2008 5:23:54 PM | A | PART |
|
|
Approved for ceiling cover at the rooms initialed and annotated on stamped plan set, see as-built drawings for accurate floorplan and head layout also initialed with today's date.
|
FIR07-00702
| INSP-Final Inspection | 5/27/2008 | 5/28/2008 | 5/28/2008 5:21:18 PM | A | PART |
|
|
Previous c/n items are finished, rough-in approved for cover as red lined on plans.
|
FIR08-00124
| INSP-Final Inspection | 5/27/2008 | 5/28/2008 | 5/28/2008 5:19:38 PM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 5/27/2008 at 4:28:25 PM. Contact: ###-####. Overbooked
|
BLD07-02932
| FIRE-Final Inspection | 5/27/2008 | 5/28/2008 | 5/28/2008 5:17:58 PM | P | NR |
|
|
Scheduled by a contractor via Hello! on 5/27/2008 at 3:54:24 PM. Contact: ###-####.
|
FIR08-00180
| INSP-Final Inspection | 5/27/2008 | 5/28/2008 | 5/28/2008 5:17:22 PM | P | CANC |
|
|
rod Phone #: ###-#### Overbooked
|
FIR08-00067
| INSP-Final Inspection | 5/27/2008 | 5/28/2008 | 5/28/2008 5:16:41 PM | P | FAIL |
|
|
Alarm line isolation valves must be secured in the open position(all risers), riser #6 pressure switch does not reset when trim line water psi is relieved.
|
FIR07-00967
| INSP-Final Inspection | 5/28/2008 | 5/28/2008 | 5/28/2008 5:12:48 PM | P | DONE |
|
|
Duplicate inspection request
|
FIR07-00967
| INSP-Final Inspection | 5/28/2008 | 5/28/2008 | 5/28/2008 5:11:55 PM | P | PASS |
|
|
Fire alarm permit finaled.
|
FIR07-00967
| INSP-Conference | 5/27/2008 | 5/28/2008 | 5/28/2008 5:01:12 PM | P | PASS |
|
|
Fire alarm permit work passed field testing, contractor to provide a signed copy of the record of completion per agreement, permit finaled.
|
BLD08-00536
| FIRE-Final Inspection | 5/28/2008 | 5/28/2008 | 5/28/2008 4:58:27 PM | P | NR |
|
|
Need project related fire alarm and sprinkler permits finaled prior to building life safety final.
|
FIR08-00313
| INSP-Final Inspection | 5/27/2008 | 5/28/2008 | 5/28/2008 4:44:55 PM | A | PASS |
|
|
Defficiencies regarding voice evac repaired, fire alarm permit finaled.
|
BLD08-00517
| FIRE-Final Inspection | 5/27/2008 | 5/28/2008 | 5/28/2008 4:43:15 PM | A | PASS |
|
|
Scope of work completed okay with the exception of approved door hardware at the exam room-contractor to provide correct type prior to structural final inspection.
|
FIR08-00352
| INSP-Final Inspection | 5/27/2008 | 5/28/2008 | 5/28/2008 4:39:13 PM | A | PASS |
|
|
Rough-in installation and final inspections completed in conjunction, fire sprinkler permit finaled.
|
FIR08-00337
| INSP-Final Inspection | 5/27/2008 | 5/28/2008 | 5/28/2008 4:37:38 PM | A | PASS |
|
|
Fire alarm work passed field test-one a/v cd setting adjusted while on site, permit finaled.
|
FIR08-00347
| INSP-Final Inspection | 5/27/2008 | 5/28/2008 | 5/28/2008 4:35:35 PM | A | FAIL |
|
|
Work is not completed for final inspection at this time.
|
FIR08-00346
| INSP-Sprinkler Rough-in/Hydro | 5/28/2008 | 5/28/2008 | 5/28/2008 4:34:27 PM | A | PART |
|
|
Overhead rough-in is approved for cover, final pending ceiling tile and escutcheon installation.
|
BLD08-00359
| FIRE-Final Inspection | 5/27/2008 | 5/28/2008 | 5/28/2008 3:58:31 PM | A | PASS |
|
|
Life safety inspection passed, tenant to remove curtain at the second exit doorway as discussed prior to structural final approval.
|
FIR07-00222
| INSP-Final Inspection | 5/27/2008 | 5/28/2008 | 5/28/2008 3:56:20 PM | A | PASS |
|
|
Missing retainers attatched per contractor verification, fire sprinkler permit finaled.
|
FIR08-00119
| FIR-Aging Inspection | 5/28/2008 | 5/28/2008 | 5/28/2008 3:52:27 PM | | DONE |
|
|
Construction underway, work in progress.
|
FIR08-00240
| INSP-Final Inspection | 5/27/2008 | 5/28/2008 | 5/28/2008 3:51:23 PM | A | PASS |
|
|
Corrections verified for completion, fire sprinkler permit finaled.
|