ESC05-01825
| Aging Inspection | 5/28/2008 | 5/28/2008 | 5/29/2008 11:44:54 AM | | DEFR |
|
|
Move to site final. CAS #460
|
ESC05-01826
| Aging Inspection | 5/28/2008 | 5/28/2008 | 5/29/2008 11:44:39 AM | | DEFR |
|
|
Move to site final. CAS #460
|
ESC05-01819
| Aging Inspection | 5/28/2008 | 5/28/2008 | 5/29/2008 11:44:24 AM | | DEFR |
|
|
Move to site final. CAS #460
|
ESC05-01806
| Aging Inspection | 5/28/2008 | 5/28/2008 | 5/29/2008 8:31:14 AM | | DEFR |
|
|
Moved to site final. CAS #460
|
ESC07-00510
| Complaint Inspection | 5/27/2008 | 5/28/2008 | 5/29/2008 8:10:41 AM | P | CANC |
|
|
|
ESC08-00349
| BMP Violation | 5/27/2008 | 5/28/2008 | 5/28/2008 3:04:44 PM | P | PART |
|
|
All concrete has been cleaned up. Also met with RP and told him that he has until 6/3/08 to get perimeter bmp's inplace. Grade is more than 2%. Will re-inspect 6/3/08 CAS #460
|
ESC07-01379
| Random Inspection | 5/28/2008 | 5/28/2008 | 5/28/2008 2:06:26 PM | P | FAIL |
|
|
Back hoe hit the water main and water spilled heavy amounts of sedimentated water into the street. They will be cleaning it all up today and will be bring out a street sweeper tonight. CAS #460
|
ESC08-00107
| Random Inspection | 5/28/2008 | 5/28/2008 | 5/28/2008 1:49:23 PM | A | PASS |
|
|
no bmp's needed on site. Everything is contained onsite. CAS #460
|
ESC05-00045
| Tracking Control | 5/28/2008 | 5/28/2008 | 5/28/2008 9:11:32 AM | A | FAIL |
|
|
Tracking coming off of project area. No stabilized construction entrance. Left message for APL. CAS #460
|
ESC08-00170
| Random Inspection | 5/28/2008 | 5/28/2008 | 5/28/2008 8:40:13 AM | A | PASS |
|
|
Due to the phase of construction, all construction entrances have been removed. Due to weather conditions there will be a street sweeper on a daily basis. The RP has informed the city over it. Site looks good. Good up keep. CAS #460
|
ESC07-01131
| Site Final | 5/27/2008 | 5/28/2008 | 5/27/2008 12:44:02 PM | A | PASS |
|
|
Work completed. CAS #460
|