Inspections for the day of: Wednesday, May 28, 2008.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC05-01825 Aging Inspection5/28/20085/28/20085/29/2008 11:44:54 AM DEFR
Move to site final.
CAS
#460
ESC05-01826 Aging Inspection5/28/20085/28/20085/29/2008 11:44:39 AM DEFR
Move to site final.
CAS
#460
ESC05-01819 Aging Inspection5/28/20085/28/20085/29/2008 11:44:24 AM DEFR
Move to site final.
CAS
#460
ESC05-01806 Aging Inspection5/28/20085/28/20085/29/2008 8:31:14 AM DEFR
Moved to site final.
CAS
#460
ESC07-00510 Complaint Inspection5/27/20085/28/20085/29/2008 8:10:41 AMPCANC
ESC08-00349 BMP Violation5/27/20085/28/20085/28/2008 3:04:44 PMPPART
All concrete has been cleaned up. Also met with RP and told him that he has until 6/3/08 to get perimeter bmp's inplace. Grade is more than 2%. Will re-inspect 6/3/08
CAS
#460
ESC07-01379 Random Inspection5/28/20085/28/20085/28/2008 2:06:26 PMPFAIL
Back hoe hit the water main and water spilled heavy amounts of sedimentated water into the street. They will be cleaning it all up today and will be bring out a street sweeper tonight.
CAS
#460
ESC08-00107 Random Inspection5/28/20085/28/20085/28/2008 1:49:23 PMAPASS
no bmp's needed on site. Everything is contained onsite.
CAS
#460
ESC05-00045 Tracking Control5/28/20085/28/20085/28/2008 9:11:32 AMAFAIL
Tracking coming off of project area. No stabilized construction entrance. Left message for APL.
CAS
#460
ESC08-00170 Random Inspection5/28/20085/28/20085/28/2008 8:40:13 AMAPASS
Due to the phase of construction, all construction entrances have been removed. Due to weather conditions there will be a street sweeper on a daily basis. The RP has informed the city over it. Site looks good. Good up keep.
CAS
#460

ESC07-01131 Site Final5/27/20085/28/20085/27/2008 12:44:02 PMAPASS
Work completed.
CAS
#460