FIR07-00015
| INSP-Final Inspection | 5/27/2009 | 5/28/2009 | 5/28/2009 4:48:50 PM | A | PASS |
|
|
Remainder of fire alarm work passed functional testing, permit approved for final status.
|
FIR08-00840
| INSP-Sprinkler Rough-in/Hydro | 5/27/2009 | 5/28/2009 | 5/28/2009 4:44:09 PM | A | PART |
|
|
Overhead installation at unit 1703 is acceptable for cover including the 17th and 18th floor levels.
|
FIR08-00786
| INSP-Alarm Testing | 5/26/2009 | 5/28/2009 | 5/28/2009 4:42:46 PM | A | PART |
|
|
Fire alarm testing completed for the second floor media center areas and adjacent corridors areas F and G, need access to test devices in one locked storage room, one SD to be added at the circulation desk, noted deleted points including door holders, dampers, relocated nac panel and deleted sd to be included on as-built set. Non-functional damper at the electrical room 1st floor retested okay after repair.
|
FIR09-00189
| INSP-Supply line flush | 5/27/2009 | 5/28/2009 | 5/28/2009 2:18:24 PM | A | PART |
|
|
UG fire supply line flush witnessed acceptable.
|
BLD07-02419
| FIRE-Alarm Testing | 5/27/2009 | 5/28/2009 | 5/28/2009 2:05:46 PM | A | PASS |
|
|
Final fire life safety walkthrough completed satisfactory, C/N items are finished, project related fire alarm and sprinkler permits are finaled, mag lock interconnections tested per fire alarm final by K. Roule, inspection passed. NOTE: inspection type is BLD- fire final.
|
BLD05-01680
| FIRE-Final Inspection | 5/28/2009 | 5/28/2009 | 5/28/2009 2:02:00 PM | P | PASS |
|
|
Fire life safety final okayed when project related fire alarm permit is detatched from this building permit per agreement with S. Arellano and M. Senteno.
|
BLD08-02249
| FIRE-Final Inspection | 5/27/2009 | 5/28/2009 | 5/28/2009 1:59:29 PM | A | PART |
|
|
Corrections at unit 554 completed. However, the smoke alarm at the second floor bedroom east side is not functional- notified contractor that repair is to be done and smoke alarm retested at structural final inspection.
|
BLD08-02331
| FIRE-Final Inspection | 5/27/2009 | 5/28/2009 | 5/28/2009 1:57:16 PM | A | FAIL |
|
|
Project related fire sprinkler permit is still in the "ready to issue" status and must be issued, called for final and approved prior to building life safety final, also noted hardware at the second exit door is not correct.
|
BLD09-00110
| FIRE-Final Inspection | 5/27/2009 | 5/28/2009 | 5/28/2009 1:55:28 PM | A | PASS |
|
|
Fire life safety inspection passed per the scope of work.
|