Inspections for the day of: Thursday, May 28, 2009.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD09-00537 FIRE-Conference5/28/20095/28/20095/28/2009 3:52:12 PMPDONE
I discussed exit sign placement with the general contractor
FIR09-00266 INSP-Alarm Testing5/27/20095/28/20095/28/2009 3:25:12 PMPFAIL
No real testing was performed. The testing and inspection reports and central station reports were not available on site form me as required per the review comments. Pull stations are mounted too high. One strobe is overspaced. There are issues with the fire sprinkler backflow as well.
BLD08-01797 FIRE-Final Inspection5/28/20095/28/20095/28/2009 3:22:44 PMPFAIL
The project related fire sprinkler permit needs to be addressed. I performed a conference with the contractor yesterday on common life safety requirements.
FIR09-00133 INSP-Final Inspection5/28/20095/28/20095/28/2009 3:20:44 PMPFAIL
Travis Phone #: ###-#### The air compressor/air maintenance device had not been resolved.
FIR09-00326 INSP-Supply line flush5/28/20095/28/20095/28/2009 3:16:03 PMPCANC
Brian has not finished installing the piping for the flush. Per conversation this will be rescheduled for tomorrow.
FIR09-00179 INSP-Final Inspection5/27/20095/28/20095/28/2009 11:44:40 AMPFAIL
The alarm interconnections need to be tested. The forward flush of the backflow needs to be performed. The backflow as installed does not match the riser detail on the city approved drawings. Contact the plan reviewer to verify if the new backflow will be adequated to remain. Contractor still needed to install a sidewall sprinkler head.
BLD09-00086 FIRE-Final Inspection5/27/20095/28/20095/28/2009 11:35:15 AMAPASS
life safety passed
FIR09-00160 INSP-Final Inspection5/27/20095/28/20095/28/2009 11:34:28 AMPPASS
permit finaled
FIR09-00326 INSP-Sprinkler Rough-in5/27/20095/28/20095/28/2009 11:28:38 AMAPART
The remaining underground piping can be covered.
BLD09-00123 FIRE-Final Inspection5/27/20095/28/20095/28/2009 9:34:42 AMAFAIL
The city approved plans were not on site. No inspection was performed.
FIR09-00092 INSP-Final Inspection5/27/20095/28/20095/28/2009 9:33:09 AMAPASS
Permit finaled
FIR09-00108 FIR-Aging Inspection5/28/20095/28/20095/28/2009 9:32:33 AM NR
Work is in progress
FIR09-00088 INSP-Final Inspection5/27/20095/28/20095/28/2009 9:31:54 AMAPASS
Permit finaled. A supervisory signal is now being sent off site.
FIR09-00086 INSP-Final Inspection5/27/20095/28/20095/28/2009 9:31:10 AMAPASS
Permit finaled
FIR09-00265 INSP-Final Inspection5/27/20095/28/20095/27/2009 3:12:24 PMPCANC
Scheduled by a contractor via Hello! on 5/27/2009 at 1:38:04 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on May 27 2009 3:12PM.