BLD09-00537
| FIRE-Conference | 5/28/2009 | 5/28/2009 | 5/28/2009 3:52:12 PM | P | DONE |
|
|
I discussed exit sign placement with the general contractor
|
FIR09-00266
| INSP-Alarm Testing | 5/27/2009 | 5/28/2009 | 5/28/2009 3:25:12 PM | P | FAIL |
|
|
No real testing was performed. The testing and inspection reports and central station reports were not available on site form me as required per the review comments. Pull stations are mounted too high. One strobe is overspaced. There are issues with the fire sprinkler backflow as well.
|
BLD08-01797
| FIRE-Final Inspection | 5/28/2009 | 5/28/2009 | 5/28/2009 3:22:44 PM | P | FAIL |
|
|
The project related fire sprinkler permit needs to be addressed. I performed a conference with the contractor yesterday on common life safety requirements.
|
FIR09-00133
| INSP-Final Inspection | 5/28/2009 | 5/28/2009 | 5/28/2009 3:20:44 PM | P | FAIL |
|
|
Travis Phone #: ###-#### The air compressor/air maintenance device had not been resolved.
|
FIR09-00326
| INSP-Supply line flush | 5/28/2009 | 5/28/2009 | 5/28/2009 3:16:03 PM | P | CANC |
|
|
Brian has not finished installing the piping for the flush. Per conversation this will be rescheduled for tomorrow.
|
FIR09-00179
| INSP-Final Inspection | 5/27/2009 | 5/28/2009 | 5/28/2009 11:44:40 AM | P | FAIL |
|
|
The alarm interconnections need to be tested. The forward flush of the backflow needs to be performed. The backflow as installed does not match the riser detail on the city approved drawings. Contact the plan reviewer to verify if the new backflow will be adequated to remain. Contractor still needed to install a sidewall sprinkler head.
|
BLD09-00086
| FIRE-Final Inspection | 5/27/2009 | 5/28/2009 | 5/28/2009 11:35:15 AM | A | PASS |
|
|
life safety passed
|
FIR09-00160
| INSP-Final Inspection | 5/27/2009 | 5/28/2009 | 5/28/2009 11:34:28 AM | P | PASS |
|
|
permit finaled
|
FIR09-00326
| INSP-Sprinkler Rough-in | 5/27/2009 | 5/28/2009 | 5/28/2009 11:28:38 AM | A | PART |
|
|
The remaining underground piping can be covered.
|
BLD09-00123
| FIRE-Final Inspection | 5/27/2009 | 5/28/2009 | 5/28/2009 9:34:42 AM | A | FAIL |
|
|
The city approved plans were not on site. No inspection was performed.
|
FIR09-00092
| INSP-Final Inspection | 5/27/2009 | 5/28/2009 | 5/28/2009 9:33:09 AM | A | PASS |
|
|
Permit finaled
|
FIR09-00108
| FIR-Aging Inspection | 5/28/2009 | 5/28/2009 | 5/28/2009 9:32:33 AM | | NR |
|
|
Work is in progress
|
FIR09-00088
| INSP-Final Inspection | 5/27/2009 | 5/28/2009 | 5/28/2009 9:31:54 AM | A | PASS |
|
|
Permit finaled. A supervisory signal is now being sent off site.
|
FIR09-00086
| INSP-Final Inspection | 5/27/2009 | 5/28/2009 | 5/28/2009 9:31:10 AM | A | PASS |
|
|
Permit finaled
|
FIR09-00265
| INSP-Final Inspection | 5/27/2009 | 5/28/2009 | 5/27/2009 3:12:24 PM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 5/27/2009 at 1:38:04 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on May 27 2009 3:12PM.
|