Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD13-03405 BLD-Energy code compliance5/28/20155/28/20155/28/2015 4:11:03 PMPPASS
Garage soffit ( North west section) and stair well # 2. Phone #: ###-#### Inspection requested via web by Tim Toups
BLD15-00289 BLD-Energy code compliance5/28/20155/28/20155/28/2015 4:08:14 PMPPASS
Before coming out, please give me a call so I make sure not to waste your time. Suite 110 is the current area of concern.
This is our status: Temp electrical=passed, mechanical permit pulled-no inspections required for this portion Permit #MEC15-02281, Ceiling grid and insulation have been installed, need inspected.
We are looking to get all inspections necessary for the temporary Cert of Occ for the two offices in Suite 110. Phone #: ###-#### Inspection requested via web by Jason Jones
BLD15-00289 BLD-Final5/28/20155/28/20155/28/2015 4:07:37 PMPPART
Before coming out, please give me a call so I make sure not to waste your time. Suite 110 is the current area of concern.
This is our status: Temp electrical=passed, mechanical permit pulled-no inspections required for this portion Permit #MEC15-02281, Ceiling grid and insulation have been installed, need inspected.
We are looking to get all inspections necessary for the temporary Cert of Occ for the two offices in Suite 110. Phone #: ###-#### Inspection requested via web by Jason Jones. ok to occupy the two new offices that were created i the existing areas only.
BLD15-00289 BLD-Framing/Rough-in5/28/20155/28/20155/28/2015 3:16:34 PMPPART
Jason Phone #: ###-####. Interior steel framing for new offices. no hardlids at this time, nedds sprinkler rough in.
BLD14-03379 BLD-Framing/Rough-in5/28/20155/28/20155/28/2015 2:36:58 PMPPASS
Please call Brian Phone #: ###-#### Inspection requested via web by Brian Stark
BLD15-00128 BLD-Foundation5/28/20155/28/20155/28/2015 2:21:48 PMPDEFR
CMU pour time 1:00PM; Tony Phone #: ###-####. Special inspetor on site.
BLD15-01339 BLD-Conference5/28/20155/28/20155/28/2015 2:12:58 PMPDONE
Ryan Phone #: ###-####
BLD13-03584 BLD-Energy code compliance5/27/20155/28/20155/28/2015 1:46:36 PMPPASS
insulation inspection Phone #: ###-#### Inspection requested via web by Mel Rawlinson
BLD13-03585 BLD-Energy code compliance5/27/20155/28/20155/28/2015 1:43:58 PMPPASS
insulation inspection Phone #: ###-#### Inspection requested via web by Mel Rawlinson
BLD15-00492 BLD-Foundation5/27/20155/28/20155/28/2015 12:01:56 PMPCANC
John Phone #: ###-####
BLD15-00494 BLD-Footing5/27/20155/28/20155/28/2015 12:01:26 PMPPASS
John Phone #: ###-####
BLD15-00487 BLD-Energy code compliance5/28/20155/28/20155/28/2015 12:00:35 PMPPASS
Pat Phone #: ###-####
BLD15-00486 BLD-Other5/28/20155/28/20155/28/2015 12:00:01 PMPPASS
Dry wall/RC1 // Pat Phone #: ###-####
BLD15-00484 BLD-Wall Bracing5/28/20155/28/20155/28/2015 11:59:26 AMPPASS
Pat Phone #: ###-####
BLD15-00857 BLD-Footing5/27/20155/28/20155/28/2015 11:55:30 AMAPASS
John Phone #: ###-####
BLD15-01398 BLD-Framing/Rough-in5/27/20155/28/20155/28/2015 11:19:57 AMAPART
Please call Randy 1 Half hour before arrival @ ###-#### Thank you Phone #: ###-#### Inspection requested via web by Dennis Harmon. Provide fire rated wood blocking, and individual encasement for primary column.
BLD14-03175 BLD-Ceiling Grid Inspection5/27/20155/28/20155/28/2015 10:28:05 AMAPASS
John Phone #: ###-####. grid in training rm only.
BLD13-01634 BLD-Ceiling Grid Inspection5/27/20155/28/20155/28/2015 9:57:39 AMAPASS
Makers studio above ceiling office.... 1st ; 2nd floor Kitchen studio ceiling contact Neal Mays Phone #: ###-#### Inspection requested via web by Jeremy Richardson
BLD14-03354 BLD-Final5/27/20155/28/20155/28/2015 8:58:02 AMANR
Clarence// please call for access Phone #: ###-####. Needs mech final.