BLD13-03405
| BLD-Energy code compliance | 5/28/2015 | 5/28/2015 | 5/28/2015 4:11:03 PM | P | PASS |
|
|
Garage soffit ( North west section) and stair well # 2. Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD15-00289
| BLD-Energy code compliance | 5/28/2015 | 5/28/2015 | 5/28/2015 4:08:14 PM | P | PASS |
|
|
Before coming out, please give me a call so I make sure not to waste your time. Suite 110 is the current area of concern. This is our status: Temp electrical=passed, mechanical permit pulled-no inspections required for this portion Permit #MEC15-02281, Ceiling grid and insulation have been installed, need inspected. We are looking to get all inspections necessary for the temporary Cert of Occ for the two offices in Suite 110. Phone #: ###-#### Inspection requested via web by Jason Jones
|
BLD15-00289
| BLD-Final | 5/28/2015 | 5/28/2015 | 5/28/2015 4:07:37 PM | P | PART |
|
|
Before coming out, please give me a call so I make sure not to waste your time. Suite 110 is the current area of concern. This is our status: Temp electrical=passed, mechanical permit pulled-no inspections required for this portion Permit #MEC15-02281, Ceiling grid and insulation have been installed, need inspected. We are looking to get all inspections necessary for the temporary Cert of Occ for the two offices in Suite 110. Phone #: ###-#### Inspection requested via web by Jason Jones. ok to occupy the two new offices that were created i the existing areas only.
|
BLD15-00289
| BLD-Framing/Rough-in | 5/28/2015 | 5/28/2015 | 5/28/2015 3:16:34 PM | P | PART |
|
|
Jason Phone #: ###-####. Interior steel framing for new offices. no hardlids at this time, nedds sprinkler rough in.
|
BLD14-03379
| BLD-Framing/Rough-in | 5/28/2015 | 5/28/2015 | 5/28/2015 2:36:58 PM | P | PASS |
|
|
Please call Brian Phone #: ###-#### Inspection requested via web by Brian Stark
|
BLD15-00128
| BLD-Foundation | 5/28/2015 | 5/28/2015 | 5/28/2015 2:21:48 PM | P | DEFR |
|
|
CMU pour time 1:00PM; Tony Phone #: ###-####. Special inspetor on site.
|
BLD15-01339
| BLD-Conference | 5/28/2015 | 5/28/2015 | 5/28/2015 2:12:58 PM | P | DONE |
|
|
Ryan Phone #: ###-####
|
BLD13-03584
| BLD-Energy code compliance | 5/27/2015 | 5/28/2015 | 5/28/2015 1:46:36 PM | P | PASS |
|
|
insulation inspection Phone #: ###-#### Inspection requested via web by Mel Rawlinson
|
BLD13-03585
| BLD-Energy code compliance | 5/27/2015 | 5/28/2015 | 5/28/2015 1:43:58 PM | P | PASS |
|
|
insulation inspection Phone #: ###-#### Inspection requested via web by Mel Rawlinson
|
BLD15-00492
| BLD-Foundation | 5/27/2015 | 5/28/2015 | 5/28/2015 12:01:56 PM | P | CANC |
|
|
John Phone #: ###-####
|
BLD15-00494
| BLD-Footing | 5/27/2015 | 5/28/2015 | 5/28/2015 12:01:26 PM | P | PASS |
|
|
John Phone #: ###-####
|
BLD15-00487
| BLD-Energy code compliance | 5/28/2015 | 5/28/2015 | 5/28/2015 12:00:35 PM | P | PASS |
|
|
Pat Phone #: ###-####
|
BLD15-00486
| BLD-Other | 5/28/2015 | 5/28/2015 | 5/28/2015 12:00:01 PM | P | PASS |
|
|
Dry wall/RC1 // Pat Phone #: ###-####
|
BLD15-00484
| BLD-Wall Bracing | 5/28/2015 | 5/28/2015 | 5/28/2015 11:59:26 AM | P | PASS |
|
|
Pat Phone #: ###-####
|
BLD15-00857
| BLD-Footing | 5/27/2015 | 5/28/2015 | 5/28/2015 11:55:30 AM | A | PASS |
|
|
John Phone #: ###-####
|
BLD15-01398
| BLD-Framing/Rough-in | 5/27/2015 | 5/28/2015 | 5/28/2015 11:19:57 AM | A | PART |
|
|
Please call Randy 1 Half hour before arrival @ ###-#### Thank you Phone #: ###-#### Inspection requested via web by Dennis Harmon. Provide fire rated wood blocking, and individual encasement for primary column.
|
BLD14-03175
| BLD-Ceiling Grid Inspection | 5/27/2015 | 5/28/2015 | 5/28/2015 10:28:05 AM | A | PASS |
|
|
John Phone #: ###-####. grid in training rm only.
|
BLD13-01634
| BLD-Ceiling Grid Inspection | 5/27/2015 | 5/28/2015 | 5/28/2015 9:57:39 AM | A | PASS |
|
|
Makers studio above ceiling office.... 1st ; 2nd floor Kitchen studio ceiling contact Neal Mays Phone #: ###-#### Inspection requested via web by Jeremy Richardson
|
BLD14-03354
| BLD-Final | 5/27/2015 | 5/28/2015 | 5/28/2015 8:58:02 AM | A | NR |
|
|
Clarence// please call for access Phone #: ###-####. Needs mech final.
|