BLD15-00789
| FIRE-Final Inspection | 5/28/2015 | 5/28/2015 | 5/28/2015 1:14:01 PM | P | PASS |
|
|
Permit Finaled
|
BLD15-00571
| FIRE-Final Inspection | 5/28/2015 | 5/28/2015 | 5/28/2015 1:13:30 PM | P | PASS |
|
|
Permit Finaled
|
FIR15-00247
| INSP-Final Inspection | 5/28/2015 | 5/28/2015 | 5/28/2015 1:12:40 PM | P | PASS |
|
|
Pemit Finaled
|
FIR14-00505
| INSP-Sprinkler Rough-in/Hydro | 5/28/2015 | 5/28/2015 | 5/28/2015 12:37:07 PM | P | PASS |
|
|
Drop downs for new heads and upright protection inspected, See the city approved plans for locations where piping is ok to cover as marked in red. Another rough in inspection will need to be performed once ceiling grid is finished, beforeceiling tile is dropped into place.
|
FIR14-00505
| INSP-Sprinkler Rough-in/Hydro | 5/27/2015 | 5/28/2015 | 5/28/2015 9:36:50 AM | A | FAIL |
|
|
Contractor dod not have the correct approved/stamped drawings on job site.
|