Inspections for the day of: Tuesday, May 28, 2019.
Number of inspections: 19
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMark Moncarr
TitleELE-INSPECTOR
Phone #685-9023
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE19-00837 Final5/28/20195/28/20195/28/2019 4:46:32 PMPPASS
For access please call Gage 1/2 hr prior to inspection. ###-#### Phone #: ###-#### Inspection requested via web by Terry Scott Ok final. Floor heat GFI functioned properly.
ELE19-01464 Electrical Rough-In5/28/20195/28/20195/28/2019 4:45:54 PMPPASS
floor heat inspection. Phone #: ###-#### Inspection requested via web by A.M.E. Office Ok cover flr heat mstr.
ELE19-01854 Final5/28/20195/28/20195/28/2019 4:45:25 PMPPASS
Customer''s number above Phone #: ###-#### Inspection requested via web by BRS Permitting Ok final. Verified brkr install on RI.
ELE18-03154 Final5/24/20195/28/20195/28/2019 4:44:42 PMPFAIL
Any Questions Please Call Louis At ###-#### Phone #: ###-#### Inspection requested via web by Louis Keller Inside recepts need to be TR. 1 GFI and 3-4 recepts needed.
ELE19-01932 Electrical Rough-In5/28/20195/28/20195/28/2019 4:41:30 PMPPASS
###-#### Ok cover. Talked to electrician, outlet to left of sink out of 24" requirement. Also, DISP ran off appliance countertop circuit. He is going to re-route DW power and put both DW DISP on same circuit. No need for nailplates for this install. Needs to be done on final.
ELE19-01932 Final5/26/20195/28/20195/28/2019 4:38:54 PMPCANC
General contractor name is Dennis and contact number is his to make sure he is on site to meet you. Phone #: ###-#### Inspection requested via web by Dylan Pierce Should have been a RI
ELE19-01936 Electrical Rough-In5/28/20195/28/20195/28/2019 4:32:42 PMPPASS
Inspection requested via web by William Andrews Ok cover.
ELE19-00976 Electrical Rough-In5/27/20195/28/20195/28/2019 1:42:33 PMPPASS
Phone #: ###-#### Inspection requested via web by Jason McKenzie Ok cover.
ELE19-01775 Electrical Rough-In5/28/20195/28/20195/28/2019 1:07:08 PMPPASS
Need a ceiling inspection Phone #: ###-#### Inspection requested via web by TRENT Swaim Ok cover ceiling throughout. Cubicles being installed, a few open areas of ceiling so power can be dropped.
ELE13-03180 Final5/24/20195/28/20195/28/2019 12:51:22 PMPPASS
Any questions please call Louis @ ###-#### Phone #: ###-#### Inspection requested via web by Louis Keller Ok final. No auto cover.
ELE19-01565 Permanent Service5/22/20195/28/20195/28/2019 12:50:24 PMAPASS
Please call Tye @ ###-#### for any additional information. Current service is installed overhead and Idaho power is installing same service underground. conduit is installed to bottom of meter, just need to make entry into meter box but Idaho power tag is on meter base door. Phone #: ###-#### Inspection requested via web by Tye Thomas p/s u/g n ok
ELE16-03107 Final5/23/20195/28/20195/28/2019 12:16:06 PMAPASS
If possible please call Marc @ ###-#### so he can make sure is there for you. Any questions regarding the electrical please call Louis @ ###-#### Phone #: ###-#### Inspection requested via web by Louis Keller Ok final.GFI protection functions properly.
ELE19-01820 Conference5/25/20195/28/20195/28/2019 11:53:41 AMADONE
Phone #: ###-#### Inspection requested via web by jeff winegar Discussed installation of new service on barn.
ELE16-03292 Final5/23/20195/28/20195/28/2019 10:43:45 AMAFAIL
Please call Mrs Cushing when on your way @ ###-####. If for some reason she is not there (she said she would be) we do have permission to in back and inspect the pool. Any question about the electrical work please call Louis at ###-#### Phone #: ###-#### Inspection requested via web by Louis Keller Recept in bell box on N side of pool is within 6' of waters edge. Recept needs removed and blanked, or moved out of 6' hofrizontal measurement.
ELE16-02832 Final5/21/20195/28/20195/28/2019 10:11:01 AMAPASS
Please Call Jan when you are on the way Jan ###-#### Any questions regarding the electrical please call Louis at ###-#### Phone #: ###-#### Inspection requested via web by Louis Keller Ok final. All GFI brkrs function properly.
ELE19-00416 Final5/28/20195/28/20195/28/2019 9:38:06 AMAFAIL
Phone #: ###-#### Inspection requested via web by Taras Shulga
1. Kitch GFIs not working.
2. 12/2 stub under deck needs box and blank.
3. Cover plates needed for bath recepts. If tile is installed, spark rings are needed.
4. Notice left on kitchen island. House was also staged. A few weeks ago on another inspection in the warms springs area, I mentioned to one of the decorators that city ordinance didn't allow furniture move in until elec inspection had been done. For re-inspect, all furniture will be moved so access is given to check all wall space.
ELE18-03556 Final5/24/20195/28/20195/28/2019 8:49:21 AMAPASS
Garage code is 1268 Phone #: ###-#### Inspection requested via web by Cevyn Recla Ok final.
ELE19-01842 Final5/24/20195/28/20195/28/2019 8:47:17 AMANH
Early if possible, please call Kaden with any questions Phone #: ###-#### Inspection requested via web by William Salts
ELE19-01842 Final5/24/20195/28/20195/24/2019 12:33:37 PMPCANC
Please call Kaden with any questions Phone #: ###-#### >> Inspection requested via web by William Salts Inspection cancelled from web by: William Salts