BLD17-04410 FIRE-Conference5/24/20195/28/20195/28/2019 10:39:38 AMADONE
Fire conference complete, due to column configuration of new canopy the fire extinguisher will be mounted just above where the concrete stops on the support columns on the wood post. Extinguisher will be slighlty above the 48 inches.

Need to confirm the location for Fire extingushers will be ok where we are going to put them before we call in our final Phone #: ###-#### Inspection requested via web by Brandon Reynolds
BLD19-01181 FIRE-Final Inspection5/24/20195/28/20195/28/2019 10:15:46 AMAPASS
Fire sprinkler inspection is complete, no fire alarm modifications, fire extinguisher will be placed in discussed location. Final life fire safety inspection for area of work complete.

Doug Phone #: ###-####
FIR19-00348 INSP-Final Inspection5/28/20195/28/20195/28/2019 10:14:48 AMAPASS
Final fire sprinkler inspection for area of work complete.
FIR18-00834 INSP-Sprinkler Rough-in5/24/20195/28/20195/28/2019 9:42:23 AMAPART
Rough in inspection for overhead fire sprinkler piping complete, a cover inspection will be required for pendant heads/arm overs before cover can be approved.

Todd Ketterling is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
BLD17-03263 FIRE-Final Inspection5/24/20195/28/20195/28/2019 8:46:59 AMAPASS
Fire sprinkler inspection for area of worki has been completed, fire alarm inspection for area of work completed, fire extinguishers are in common areas with current inspection tags. Final life fire safety inspection for B51 pedestrian link complete.

Dillon Phone #: ###-####