Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-01620 General Inspection5/22/20195/28/20195/29/2019 12:25:01 PMPPASS
Trash box emptied and lot cleaned up. Some trash but very little.
ESC18-01273 General Inspection5/28/20195/28/20195/28/2019 10:45:14 AMPPASS
Site is surrounded by pit run. Few workers on site, most in interior. No trackout, both exits are stabalized.
ESC18-01130 General Inspection5/28/20195/28/20195/28/2019 10:32:00 AMPPASS
Lot is paved, most curb and sidewalk completed, ecopan on site. Landscapers on site, removing silt fence as they go.
ESC19-00157 General Inspection5/28/20195/28/20195/28/2019 10:03:11 AMPPASS
WIP. ARea is in substation, all pea gravel. Ecopan on site no ESC issues.
ESC18-01489 General Inspection5/28/20195/28/20195/28/2019 9:52:26 AMPPASS
Site is contained. No trackout into lot. No issues.
ESC18-00301 General Inspection5/28/20195/28/20195/28/2019 9:42:54 AMPPASS
No activity.
ESC19-00401 Site Preparation5/28/20195/28/20195/28/2019 9:32:39 AMPPASS
Wattle on perimeter along Milwaukee, silt fence and swale protectiong southern perimeter. Site WIP, no dust. Some dirt on apron leading to Milwaukee, lloks old.