Inspections for the day of: Thursday, May 28, 2020.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorChad Schwendiman
TitleMEC-INSPECTOR
Phone #780-9549
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC20-00499 Final5/27/20205/28/20205/28/2020 10:04:14 AMAPASS
Mechanical Gas Fireplace Final Inspection. Manual is in kitchen drawer right of stove top area. Garage Code: 4224 Phone #: ###-#### Inspection requested via web by Dan Otero
MEC20-01800 Final5/22/20205/28/20205/28/2020 9:37:22 AMAFAIL
Please call ahead to Mike @ ###-#### when headed out to the residence Phone #: ###-#### Inspection requested via web by Sarah Small - Need to install a service switch on the furnace, secondary condensate drain needs to be ran independently, Need locking caps on refrigeration piping
MEC20-01360 Pressure Test5/27/20205/28/20205/28/2020 9:02:24 AMAPASS
please contact john prior to arrival for access Phone #: ###-#### Inspection requested via web by Nicholas Paige - 60lb gas pass for units 13-16
MEC19-05485 Pressure Test5/27/20205/28/20205/28/2020 8:39:39 AMAPASS
CHRIS IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER - 20lb gas pass for the piping in the hanger area
MEC20-01218 Final5/27/20205/28/20205/28/2020 8:19:45 AMAPASS
Phone #: ###-#### Inspection requested via web by Lindsey Stegemann
MEC20-01962 Rough-in5/27/20205/28/20205/28/2020 8:19:33 AMAFAIL
Phone #: ###-#### Inspection requested via web by Debbie Marino - Corrections have not been fixed
MIS20-00169 MEC-Conference5/28/20205/28/20205/28/2020 7:19:46 AMADONE
Met onsite with Intermountain Gas to go through and evaluate the service space on the gas meters. Buildings A, B, C, D and E all need the A/C unit in front of the gas meter moved to a different location. We marked one unit on the back side of building G that needs to be slide forward away from the meters. It looks like this can be done without disconnecting the A/C. Buildings F, H, I, and J are all okay and no units need to be moved. According to Intermountain Gas, the A/C unit in front of the meter for C103 needs to be moved within the next two weeks for them to complete their required change out of the meter. The rest of the units need to be moved within 90 days.