BLD1053933
| INSP - Final | 5/29/1996 | 5/29/1996 | 5/29/1996 12:00:00 AM | | PART |
|
|
/ / 342 -
|
BLD95-02164
| INSP - Footings | 5/29/1996 | 5/29/1996 | 5/29/1996 12:00:00 AM | | PART |
|
|
/ / 342 - Agreement w/ asst Trammel coordinator that they are to get a Joel is to verify that, as well as correct conditions for a pour in wate met as outlined in the approved plan and UBC criteria. Also agreed to ha ready all future ite
|
BLD95-02164
| INSP - Footings | 5/29/1996 | 5/29/1996 | 5/29/1996 12:00:00 AM | | FAIL |
|
|
/ / 342 -
|
BLD95-02164
| INSP - Conference | 5/29/1996 | 5/29/1996 | 5/29/1996 12:00:00 AM | | FAIL |
|
|
/ / 342 - Kelly w/Trammel has an attitude problem. He stormed off whil in progress w/Joel about concrete pour in moving water and cover issue.
|
BLD96-00248
| INSP - Framing/Rough-in | 5/29/1996 | 5/29/1996 | 5/29/1996 12:00:00 AM | | PASS |
|
|
/ / 342 -
|
BLD96-00327
| INSP - Framing/Rough-in | 5/29/1996 | 5/29/1996 | 5/29/1996 12:00:00 AM | | PASS |
|
|
/ / 342 -
|
BLD96-01392
| INSP - Conference | 5/29/1996 | 5/29/1996 | 5/29/1996 12:00:00 AM | | PASS |
|
|
/ / 342 -
|
BLD96-01392
| INSP - Footings | 5/29/1996 | 5/29/1996 | 5/29/1996 12:00:00 AM | | PASS |
|
|
/ / 342 -
|