BLD01-00233
| BLD-Final | 5/25/2001 | 5/29/2001 | 5/29/2001 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 05/25/2001 at 10:20:35. Contact: ###-####....spoke w/ Jason, recall when all trades ok'd 5/30/2001 9:13:32 AM
|
BLD01-00480
| BLD-Final | 5/25/2001 | 5/29/2001 | 5/29/2001 12:00:00 AM | A | PASS |
|
|
needs sign off on demo ###-#### Dave
|
BLD00-02390
| BLD-Final | 5/25/2001 | 5/29/2001 | 5/29/2001 12:00:00 AM | A | FAIL |
|
|
need shell ok'd, 5/30/2001 1:38:35 PM
|
BLD00-01631
| BLD-Final | 5/25/2001 | 5/29/2001 | 5/29/2001 12:00:00 AM | A | NR |
|
|
need verify bond or p&z ok for roof top equip. 5/30/2001 9:14:19 AM
|
BLD01-00915
| BLD-Framing/Rough-in | 5/25/2001 | 5/29/2001 | 5/29/2001 12:00:00 AM | A | PART |
|
|
###-####, rec'd arch's detail for t.o.w. 5/30/2001 9:14:47 AM
|
BLD00-03316
| BLD-Conference | 5/29/2001 | 5/29/2001 | 5/29/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 5/29/2001 9:24:00 AM w/ Ken, keep c/n re racking & door hdwe
|
MEC01-00817
| Conference | 5/29/2001 | 5/29/2001 | 5/29/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 5/29/2001 9:27:58 AM w/325 re final...need Alan's ok?
|
MEC01-00169
| Final | 5/29/2001 | 5/29/2001 | 5/29/2001 12:00:00 AM | P | PASS |
|
|
###-####; c/n appears ok 5/30/2001 9:07:35 AM
|
BLD01-01075
| BLD-Conference | 5/29/2001 | 5/29/2001 | 5/29/2001 12:00:00 AM | P | PASS |
|
|
Eva ###-####; met w/ owner & carpenter onsite...ok to place cross ties at ea. rafter, nail as shown or bolt 5/30/2001 9:08:57 AM
|
BLD01-00946
| BLD-Framing/Rough-in | 5/29/2001 | 5/29/2001 | 5/29/2001 12:00:00 AM | P | NR |
|
|
###-#### Kelly or ###-#### call first ...show all eng'g & plans, recall 5/30/2001 9:12:43 AM
|
MEC01-01419
| Final | 5/29/2001 | 5/29/2001 | 5/29/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 05/29/2001 at 10:30:42. Contact: ###-####.c/n, complete cut in & connect exhaust ducts 5/30/2001 9:11:51 AM
|
BLD01-00299
| BLD-Footing | 5/25/2001 | 5/29/2001 | 5/29/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 05/25/2001 at 08:08:13. Contact: ###-####..grading permit only, spoke w/ supt...verify appropriate permit prior to placing concrete, verify spec insp. 5/30/2001 9:10:15 AM
|