Inspections for the day of: Tuesday, May 29, 2001.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Johnson
TitlePLM-INSPECTOR
Phone #794-9476
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM01-01698 Plumbing Rough-in5/25/20015/29/20015/29/2001 12:00:00 AMAFAIL
###-#### air test on drain's waste and vent's failed 5/29/2001 2:50:18 PM
PLM00-04119 Groundwork5/25/20015/29/20015/29/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 05/25/2001 at 16:58:41. Contact: ###-####. second section of case drain's water test ok 5/29/2001 9:34:08 AM
PLM01-01707 Plumbing Rough-in5/29/20015/29/20015/29/2001 12:00:00 AMPPART
###-#### around 3:00: changed to a partial on 8/22 for Jim becuase they tore the house down and the plumbing and it had to be replumbed. Lee Rice
PLM01-01708 Plumbing Rough-in5/29/20015/29/20015/29/2001 12:00:00 AMPPASS
###-####
PLM01-01648 Sprinkler (Final)5/29/20015/29/20015/29/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 05/29/2001 at 09:21:47. Contact: ###-####. ok to cover need plugs for test ports 5/29/2001 4:58:53 PM
PLM01-01711 Plumbing Rough-in5/29/20015/29/20015/29/2001 12:00:00 AMPPASS
Neil ###-####
PLM01-00385 Final5/29/20015/29/20015/29/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 05/29/2001 at 09:26:38. Contact: ###-####.
PLM01-01724 Plumbing Rough-in5/29/20015/29/20015/29/2001 12:00:00 AMPPASS
###-####
PLM01-01725 Plumbing Rough-in5/29/20015/29/20015/29/2001 12:00:00 AMPPASS
Rob ###-####
PLM01-01724 Plumbing Rough-in5/29/20015/29/20015/29/2001 12:00:00 AMPPASS
Scheduled by Inspector: 360 On 5/29/2001 3:38:38 PM