BLD01-01691
| BLD-Final | 5/28/2002 | 5/29/2002 | 5/29/2002 12:00:00 AM | A | CANC |
|
|
###-#### ERIC called and cancled. 5/29/2002 11:32:24 AM
|
BLD02-00840
| BLD-Framing/Rough-in | 5/28/2002 | 5/29/2002 | 5/29/2002 12:00:00 AM | A | PART |
|
|
###-#### ok to insulate need lateral brace on trusses noted on truss engineering to be checked at engery insp. 5/29/2002 2:06:44 PM
|
BLD01-01763
| BLD-Final | 5/28/2002 | 5/29/2002 | 5/29/2002 12:00:00 AM | A | PASS |
|
|
eric ###-#### fn final ok 5/29/2002 11:28:39 AM
|
BLD01-01772
| BLD-Final | 5/28/2002 | 5/29/2002 | 5/29/2002 12:00:00 AM | A | PASS |
|
|
fn occ eric ###-#### final ok 5/29/2002 11:06:58 AM
|
BLD02-01008
| BLD-Framing/Rough-in | 5/28/2002 | 5/29/2002 | 5/29/2002 12:00:00 AM | A | PART |
|
|
###-#### exterior ok for cover. 5/29/2002 5:08:00 PM
|
BLD02-00471
| BLD-Framing/Rough-in | 5/28/2002 | 5/29/2002 | 5/29/2002 12:00:00 AM | A | PASS |
|
|
fr insp -jim ###-####
|
BLD02-00471
| BLD-Energy code compliance | 5/28/2002 | 5/29/2002 | 5/29/2002 12:00:00 AM | A | PASS |
|
|
jim ###-####
|
BLD01-00964
| BLD-Framing/Rough-in | 5/29/2002 | 5/29/2002 | 5/29/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 05/29/2002 at 07:17:14. Contact: . ok to insulate walls. slamer studs/draft stop/access at over builds/ girder trussess nailling. 5/29/2002 5:00:51 PM
|
BLD02-00015
| BLD-Final | 5/28/2002 | 5/29/2002 | 5/29/2002 12:00:00 AM | A | NR |
|
|
fn insp ###-#### keith -call 1st before insp need fire sing off no insp. performed. 5/29/2002 11:23:31 AM
|
BLD02-00996
| BLD-Conference | 5/29/2002 | 5/29/2002 | 5/29/2002 12:00:00 AM | A | PASS |
|
|
change of leadger to top of bearing wall for roof aplaction ok 301.
|
BLD02-00176
| BLD-Foundation | 5/28/2002 | 5/29/2002 | 5/29/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 05/28/2002 at 10:10:01. Contact: ###-####.
|
BLD01-00952
| BLD-Framing/Rough-in | 5/29/2002 | 5/29/2002 | 5/29/2002 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 05/29/2002 at 10:36:29. Contact: . complet fire stopping. 5/29/2002 4:59:46 PM
|
BLD01-01765
| BLD-Final | 5/29/2002 | 5/29/2002 | 5/29/2002 12:00:00 AM | P | PASS |
|
|
|
BLD01-02240
| BLD-Final | 5/28/2002 | 5/29/2002 | 5/29/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 05/28/2002 at 14:23:35. Contact: ###-####. temp ok need mti and engineer to sign off on low prism breaks / state pharmcy law need justafacation to locking hardware on egrees doors out of pharmcy 5/29/2002 3:47:45 PM
|