Inspections for the day of: Wednesday, May 29, 2002.
Number of inspections: 19
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM02-00044 Final5/28/20025/29/20025/29/2002 12:00:00 AMAPASS
###-####
PLM02-00787 Final5/28/20025/29/20025/29/2002 12:00:00 AMANH
Scheduled by a contractor via Hello! on 05/28/2002 at 17:01:33. Contact: ###-####.
PLM02-01534 Plumbing Rough-in5/29/20025/29/20025/29/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 05/29/2002 at 07:21:48. Contact: ###-####. waste and vent test failed 5/29/2002 10:49:55 AM
PLM02-00722 Final5/28/20025/29/20025/29/2002 12:00:00 AMANR
Scheduled by a contractor via Hello! on 05/28/2002 at 11:04:59. Contact: ###-####.
PLM02-01482 Plumbing Rough-in5/28/20025/29/20025/29/2002 12:00:00 AMAPART
r/i -kim- ###-#### r/i ok to cover , provide a copy of the sewer maintenance easement prior to final inspection 5/29/2002 9:33:10 AM
PLM02-01485 Sprinkler (Final)5/28/20025/29/20025/29/2002 12:00:00 AMAPASS
JOHN ###-####
PLM02-01544 Sprinkler (Final)5/28/20025/29/20025/29/2002 12:00:00 AMAPASS
###-####
PLM02-00906 Groundwork5/28/20025/29/20025/29/2002 12:00:00 AMAPART
###-#### terry water for escalator pits on north side test on water underground water to future fish tank 5/29/2002 9:08:15 AM
PLM02-01545 Sprinkler (Final)5/28/20025/29/20025/29/2002 12:00:00 AMAFAIL
###-#### provide he listing for the tee at the main water tie in or replace with barbed insert adaptors. 5/29/2002 10:35:45 AM
PLM02-01546 Sprinkler (Final)5/28/20025/29/20025/29/2002 12:00:00 AMPPASS
###-#### TIM
PLM02-00722 Final5/29/20025/29/20025/29/2002 12:00:00 AMPFAIL
Scheduled by Inspector: 330 On 5/29/2002 10:06:32 AM set all equipment, auto soap dispensor at janitor sink needs its own water supply, calk 3 compartment sink. 5/29/2002 3:55:02 PM
PLM02-01512 Sprinkler (Final)5/29/20025/29/20025/29/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 05/29/2002 at 10:07:36. Contact: ###-####.
PLM02-01539 Sprinkler (Final)5/29/20025/29/20025/29/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 05/29/2002 at 10:09:26. Contact: ###-####.
PLM02-01544 Sprinkler (Final)5/29/20025/29/20025/29/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 05/29/2002 at 10:10:41. Contact: ###-####. did this one this morning 5/29/2002 2:28:48 PM
PLM02-01551 Sprinkler (Final)5/29/20025/29/20025/29/2002 12:00:00 AMPPASS
###-#### felix
PLM02-01553 Water and/or Sewer5/29/20025/29/20025/29/2002 12:00:00 AMPPASS
###-#### steve
PLM02-01555 Sprinkler (Final)5/29/20025/29/20025/29/2002 12:00:00 AMPPASS
###-#### DARRELL
PLM02-01556 Water and/or Sewer5/29/20025/29/20025/29/2002 12:00:00 AMPPASS
###-#### JOHN
PLM02-01549 Water and/or Sewer5/29/20025/29/20025/29/2002 12:00:00 AMPPASS
Added by Inspector: 330 On 5/29/2002 3:08:53 PM