PLM02-01542
| Water and/or Sewer | 5/28/2002 | 5/29/2002 | 5/29/2002 12:00:00 AM | A | PASS |
|
|
water line -dennis- ###-####
|
PLM02-01510
| Plumbing Rough-in | 5/28/2002 | 5/29/2002 | 5/29/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/28/2002 at 12:05:44. Contact: ###-####.
|
PLM02-01273
| Final | 5/28/2002 | 5/29/2002 | 5/29/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 05/28/2002 at 13:14:37. Contact: ###-####. KEY IS ABOVE ENTRY DOOR ON THE LEDGE need thermal expansion tank need to install vacuum breaker on one beauty sink called plumbing contractor will recall when corrected 5/29/2002 11:50:36 AM
|
PLM02-01531
| Plumbing Rough-in | 5/28/2002 | 5/29/2002 | 5/29/2002 12:00:00 AM | A | CANC |
|
|
###-#### pat canc. by pat 5/29/2002 9:35:36 AM
|
PLM02-01177
| Final | 5/28/2002 | 5/29/2002 | 5/29/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 05/28/2002 at 08:28:06. Contact: ###-####.
|
PLM02-01340
| Water and/or Sewer | 5/28/2002 | 5/29/2002 | 5/29/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 360 On 5/28/2002 6:10:14 PM
|
PLM02-01104
| Final | 5/29/2002 | 5/29/2002 | 5/29/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 05/29/2002 at 07:33:48. Contact: ###-####.
|
PLM02-01085
| Final | 5/29/2002 | 5/29/2002 | 5/29/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 05/29/2002 at 07:34:59. Contact: ###-####.
|
PLM02-00963
| Final | 5/29/2002 | 5/29/2002 | 5/29/2002 12:00:00 AM | P | PART |
|
|
naomi- ###-#### fn need vacuum breaker installed on beauty sink caulk around water closet base 5/29/2002 3:34:12 PM
|
PLM02-01550
| Water and/or Sewer | 5/29/2002 | 5/29/2002 | 5/29/2002 12:00:00 AM | P | CANC |
|
|
leo ###-#### swr & water--swr line repair canc. by leo 5/29/2002 4:25:25 PM
|
PLM02-01552
| Water and/or Sewer | 5/29/2002 | 5/29/2002 | 5/29/2002 12:00:00 AM | P | CANC |
|
|
leo ###-#### water line canc. by leo 5/29/2002 4:25:05 PM
|
PLM02-01355
| Plumbing Rough-in | 5/29/2002 | 5/29/2002 | 5/29/2002 12:00:00 AM | P | PASS |
|
|
###-#### RAY
|
PLM02-01557
| Sprinkler (Final) | 5/29/2002 | 5/29/2002 | 5/29/2002 12:00:00 AM | P | PASS |
|
|
tim- cell ###-#### backflow
|