Inspections for the day of: Wednesday, May 29, 2002.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRick Jackson
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR02-00010 INSP-Supply line flush5/28/20025/29/20025/29/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 05/28/2002 at 13:26:41. Contact: ###-####. see permit FIR01-00557; underground complete and doc finaled 5/29/2002 10:39:57 AM
BLD02-00422 FIRE-Final Inspection5/28/20025/29/20025/29/2002 12:00:00 AMAPASS
###-#### - Si (see) all items from previous inspection completed; final occ approved 5/29/2002 10:50:14 AM
BLD02-01016 FIRE-Final Inspection5/28/20025/29/20025/29/2002 12:00:00 AMAPASS
Don, ###-####
FIR02-00094 INSP-Final Inspection5/29/20025/29/20025/29/2002 12:00:00 AMAPASS
Scheduled by Inspector: 409 On 5/29/2002 7:37:20 AM
FIR01-00557 INSP-Supply line flush5/29/20025/29/20025/29/2002 12:00:00 AMAPASS
Scheduled by Inspector: 409 On 5/29/2002 8:14:30 AM hydro and flush okay 5/29/2002 10:39:22 AM
FIR01-00557 INSP-Final Inspection5/29/20025/29/20025/29/2002 12:00:00 AMAPASS
Added by Inspector: 409 On 5/29/2002 10:38:25 AM
BLD01-02240 FIRE-Final Inspection5/28/20025/29/20025/29/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 05/28/2002 at 09:12:39. Contact: ###-####.
FIR02-00199 INSP-Final Inspection5/28/20025/29/20025/29/2002 12:00:00 AMPPASS
###-####
FIR01-00077 INSP-Final Inspection5/28/20025/29/20025/29/2002 12:00:00 AMPPASS
###-####
FIR00-00461 INSP-Alarm Testing5/28/20025/29/20025/29/2002 12:00:00 AMPPASS
###-#### chris fire panel replaced as indicated for this permit 5/29/2002 1:08:31 PM
BLD02-01121 FIRE-Final Inspection5/29/20025/29/20025/29/2002 12:00:00 AMPPASS
Scheduled by Inspector: 409 On 5/29/2002 3:04:32 PM
BLD02-01043 FIRE-Final Inspection5/29/20025/29/20025/29/2002 12:00:00 AMPPASS
Added by Inspector: 409 On 5/29/2002 3:39:27 PM