BLD02-03031
| BLD-Framing/Rough-in | 5/28/2003 | 5/29/2003 | 5/29/2003 12:00:00 AM | A | FAIL |
|
|
shawn; Phone #: ###-#### Internet Inspection Request from: Annette Moore shear fail c/n on site hold downs missing 5/29/2003 11:12:41 AM
|
BLD02-02621
| BLD-Final | 5/28/2003 | 5/29/2003 | 5/29/2003 12:00:00 AM | A | PASS |
|
|
mitchell please call 1o min before so that he can be there to let you in; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD03-00315
| BLD-Framing/Rough-in | 5/29/2003 | 5/29/2003 | 5/29/2003 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 5/29/2003 at 7:13:38 AM. Contact: ###-####. need to fire cualk and protect all opennings in walls and floors 5/29/2003 12:04:34 PM
|
BLD03-00685
| BLD-Framing/Rough-in | 5/29/2003 | 5/29/2003 | 5/29/2003 12:00:00 AM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: josh strasser ok to insulate 5/29/2003 2:49:18 PM
|
MEC03-01339
| Pressure Test | 5/29/2003 | 5/29/2003 | 5/29/2003 12:00:00 AM | P | PASS |
|
|
|
MEC03-01339
| Final | 5/29/2003 | 5/29/2003 | 5/29/2003 12:00:00 AM | P | PASS |
|
|
|
BLD02-03058
| BLD-Framing/Rough-in | 5/28/2003 | 5/29/2003 | 5/29/2003 12:00:00 AM | P | NR |
|
|
###-####
|
BLD03-00817
| BLD-Energy code compliance | 5/28/2003 | 5/29/2003 | 5/29/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 5/28/2003 at 4:51:54 PM. Contact: ###-####.c/n completed ok to cover 5/29/2003 5:26:21 PM
|
BLD02-02902
| BLD-Final | 5/28/2003 | 5/29/2003 | 5/28/2003 4:47:18 PM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 5/28/2003 at 3:01:21 PM. Contact: ###-####. Inspection cancelled from web by: Barbara Moore
|