Inspections for the day of: Thursday, May 29, 2003.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR03-00218 INSP-Final Inspection5/27/20035/29/20035/29/2003 12:00:00 AMAFAIL
alarmco; Phone #: ###-#### Provide knox key box and provide a map at the FACP. 5/29/2003 12:12:51 PM
FIR03-00095 INSP-Final Inspection5/28/20035/29/20035/29/2003 12:00:00 AMAFAIL
###-#### No inspection was done. Approved fire alarm drawings are required for the alarm work performed connecting the hoods to the existing fire alarm system 5/29/2003 10:06:06 AM
BLD03-00654 FIRE-Final Inspection5/28/20035/29/20035/29/2003 12:00:00 AMAPART
###-#### DUSTIN A temporary occupancy was given with dave millers permission until the fire alarm system for the strip mall has been approved, installed and inspected 5/30/2003 11:57:29 AM
FIR03-00177 INSP-Sprinkler Rough-in/Hydro5/28/20035/29/20035/29/2003 12:00:00 AMAPASS
cameron; Phone #: ###-#### Sprinkler piping is ok in the south wing. Insulation still missing on the plastic piping in places. I called cameron and left message not to cover pipe until I had reinspected it. 5/29/2003 8:51:04 AM
FIR01-00462 INSP-Sprinkler Rough-in/Hydro5/28/20035/29/20035/29/2003 12:00:00 AMAPART
mike; Phone #: ###-#### Started the 24 hour test on the santuary dry system. At 1:00 the system is sitting at 41 1/2 lbs. 5/29/2003 1:16:00 PM
BLD03-00366 FIRE-Final Inspection5/28/20035/29/20035/29/2003 12:00:00 AMAFAIL
Remove the bar locking the double doors in the installation area. Gary said he would install automatic flush bolts 5/29/2003 10:38:45 AM
BLD02-02314 FIRE-Final Inspection5/29/20035/29/20035/29/2003 12:00:00 AMPPASS
life safety finaled 5/29/2003 3:53:38 PM
FIR03-00175 INSP-Sprinkler Rough-in/Hydro5/29/20035/29/20035/29/2003 12:00:00 AMPFAIL
john; Phone #: ###-#### I spoke with john the installer and left a message with cameron the superintendant that the insulation was still missing over a light fixture in the hallway and that at the south end of the building the piping is now sandwiched between insulation 5/29/2003 3:16:21 PM
FIR03-00057 INSP-Conference5/29/20035/29/20035/29/2003 12:00:00 AMPDONE
ED; Phone #: ###-#### I spoke with Ed about the placement of exit signs. Dave Miller and I agreed that one sign beside the doors would be ok in lue of mounting the exit signs on long pendants in front of the doors 5/29/2003 2:53:53 PM
FIR01-00462 INSP-Sprinkler Rough-in/Hydro5/29/20035/29/20035/29/2003 12:00:00 AMPPASS
200 lb hydro test for the sanctuary dry system is ok