Inspections for the day of: Tuesday, May 29, 2007.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBob Reichert
TitleELE-INSPECTOR
Phone #794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE07-00925 Final5/29/20075/29/20075/29/2007 3:39:15 PMPPASS
brandon ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith ok to final
ELE07-00704 Final5/29/20075/29/20075/29/2007 3:13:28 PMPPASS
Craig ###-#### corrections made, ok to final
ELE07-00200 Final5/29/20075/29/20075/29/2007 2:47:22 PMPPASS
Reinspection Phone #: ###-#### Internet Inspection Request from: Ryan Christensen called to work on circ directory, and address, ok to final
ELE07-00198 Final5/29/20075/29/20075/29/2007 2:17:55 PMPFAIL
Reinspection Phone #: ###-#### Internet Inspection Request from: Ryan Christensen called, corrections not made,
ELE07-00197 Final5/29/20075/29/20075/29/2007 1:58:36 PMPFAIL
Reinspection Phone #: ###-#### Internet Inspection Request from: Ryan Christensen called, left message, corrections not made
ELE07-01827 Permanent Service5/29/20075/29/20075/29/2007 1:48:04 PMPPASS
Scheduled by a contractor via Hello! on 5/29/2007 at 9:16:03 AM. Contact: ###-####. called, told contr to change abrasion prot for gec, use job id sticker, need to check shack once installed, p/s o/h n ok
ELE07-01894 Electrical Rough-In5/29/20075/29/20075/29/2007 12:55:24 PMPPASS
rough in only ###-#### Internet Inspection Request from: Todd Holbrook called about recpt, nail plate, ric ok
ELE07-00647 Final5/29/20075/29/20075/29/2007 12:24:07 PMPPASS
Scheduled by a contractor via Hello! on 5/29/2007 at 8:20:54 AM. Contact: ###-####. n ok to final
ELE07-01648 Permanent Service5/29/20075/29/20075/29/2007 12:08:48 PMPPASS
p/s exst pedestal rec ok
ELE07-01907 Electrical Rough-In5/25/20075/29/20075/29/2007 11:07:19 AMAPASS
chad - pls call an hour before inspection; Phone #: ###-#### Internet Inspection Request from: Victoria Beall ric ok
ELE05-03150 Final5/25/20075/29/20075/29/2007 10:39:58 AMAPASS
Ready for the Final. Thanks Phone #: ###-#### x0000 Internet Inspection Request from: BRIAN KEITH met contr, sogned occ card, ok to final, checking on bowling alley
ELE07-01551 Electrical Rough-In5/25/20075/29/20075/29/2007 9:09:33 AMAPART
joe Note: west side rm 2nd floor ; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles 2nd floor rooms west side anop ok to cover
ELE06-03238 Final5/25/20075/29/20075/29/2007 8:28:39 AMAPASS
Scheduled by a contractor via Hello! on 5/25/2007 at 10:26:51 AM. Contact: ###-####. told owner to use in-use cover, ok to final
ELE07-01908 Temporary Service5/25/20075/29/20075/29/2007 7:56:53 AMAFAIL
schaffeld; Phone #: ###-#### Internet Inspection Request from: Victoria Beall called, left corr notice, nec 250.53(G) ground rods shall be driven such that 8' is in contact with earth, and or 45 degrees or less, 590.6(B) ground fault protection shall be provided for other than 15 or 20a recpts, 312.5 abrasion protection shall be provided for all conductors entering enclosures, BCC job id sticker shall be posted