Inspections for the day of: Thursday, May 29, 2008.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR07-00812 INSP-Sprinkler Rough-in/Hydro5/28/20085/29/20085/30/2008 11:43:20 AMAFAIL
Inspection for the office areas only second and first floors north side completed today, noted SW head at the first floor stair landing is too low, line under the staris at the warehouse is 1 1/4 fed by a 1" tap-also missing ret. strap at a beam clamp, will require as-built plans for the second floor branchline pipe size changes, stairway heads at the 2nd floor are not complete, verified items from previous inspection are done, okayed for cover at the drop ceilings.
FIR08-00180 INSP-Final Inspection5/28/20085/29/20085/29/2008 6:07:18 PMANR
Scheduled by a contractor via Hello! on 5/28/2008 at 3:15:38 PM. Contact: ###-####.
BLD07-02932 FIRE-Final Inspection5/28/20085/29/20085/29/2008 6:04:01 PMAFAIL
Project related fire sprinkler permits are not ready for final, noted new beer cooler does not provide adequate egress under door failure conditions.
FIR08-00124 INSP-Final Inspection5/28/20085/29/20085/29/2008 6:02:01 PMAFAIL
Defficiencies noted include missing stock of ESFR heads at the riser head box, overspaced upright heads at the new grade level riser room, 3 branchlines at the warehouse area are too low for pendent ESFR head listing, pendent heads at the office storage room and men's restroom are obstructed by surface mounted lights, DP at the cooler condensers have been added.
FIR08-00067 INSP-Final Inspection5/28/20085/29/20085/29/2008 3:49:39 PMAFAIL
Correction items are not complete, still require alarm line shutoff valve supervision at all six risers.
FIR07-00830 INSP-Alarm Testing5/28/20085/29/20085/29/2008 1:44:49 PMAPART
See approved plans for areas inspected today. Noted smoke detectors at six patient rooms were relocated and tested as per Forrest notes, construction is still underway at some locations.
BLD08-00632 FIRE-Final Inspection5/28/20085/29/20085/29/2008 1:43:14 PMADONE
Permit details indicate no fire inspection related signatures are required for this project, work scheduled for a structural final.
BLD08-00752 FIRE-Final Inspection5/28/20085/29/20085/29/2008 1:40:03 PMAPASS
Fire life safety inspection passed, okayed temp suite address signage until permanent is delivered.
FIR08-00294 INSP-Sprinkler Rough-in5/28/20085/29/20085/29/2008 1:27:12 PMACANC
john Phone #: ###-#### NOTE: Inspection type does not correlate with permit description for work performed.
BLD08-00897 FIRE-Final Inspection5/27/20085/29/20085/29/2008 1:16:40 PMADEFR
2 of 2 scheduled in this time slot...other is FA / Horn & Strobe Final Phone #: ###-#### Internet Inspection Request from: Wayne Berry
FIR08-00333 INSP-Final Inspection5/27/20085/29/20085/29/2008 1:16:21 PMADEFR
1 of 2 scheduled in this time slot. Life safety on BLD will be the 2nd. Phone #: ###-#### Internet Inspection Request from: Wayne Berry
FIR07-00606 INSP-Sprinkler Rough-in/Hydro5/28/20085/29/20085/29/2008 1:16:04 PMAPART
See previous inspection notes for activities to date.
FIR08-00168 INSP-Alarm Testing5/28/20085/29/20085/29/2008 12:58:36 PMPPART
Listed correction notice items verified for compliance, permit final pending completion of phase two remodel work at the east side including notification appliances and riser #2 alarm and supervisory conditions.
BLD08-00725 FIRE-Final Inspection5/29/20085/29/20085/29/2008 12:54:47 PMPFAIL
Remove manual thumbturn at the main entry/exit door, post missing suite address numbers, PFE needs to be posted as discussed.
FIR07-00946 INSP-Final Inspection5/28/20085/29/20085/29/2008 11:25:45 AMAPASS
Test all new devices add for elevator recall per state inspection. KR
FIR08-00349 INSP-Final Inspection5/28/20085/29/20085/29/2008 9:44:03 AMAPASS
Sprinkler inspection completed.KR
FIR08-00018 FIR-Aging Inspection5/29/20085/29/20085/29/2008 7:51:28 AM DONE
Work in progress, construction underway.