Inspections for the day of: Friday, May 29, 2009.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR08-00786 INSP-Alarm Testing5/26/20095/29/20095/29/2009 4:58:04 PMAPART
Completed fire alarm testing for the second floor classroom wings areas F and G. Noted three smoke detectors to be moved due to overspacing, one notification appliance is overspaced, also annotated field changes including deleted dampers, door holds and smoke detectors at some areas.
BLD09-00528 FIRE-Final Inspection5/28/20095/29/20095/29/2009 2:00:23 PMAPASS
Fire life safety for the portion of demo permit work indicated passed inspection for both upper and lower floor levels.
BLD08-02331 FIRE-Final Inspection5/28/20095/29/20095/29/2009 1:56:29 PMAPASS
C/N items are complete, fire life safety inspection passed. NOTE: No inspection card available on site for signature.
BLD08-01796 FIRE-Final Inspection5/29/20095/29/20095/29/2009 1:55:33 PMPPASS
Shell building fire life safety inspection completed satisfactory.
BLD08-01797 FIRE-Final Inspection5/28/20095/29/20095/29/2009 1:52:58 PMAPASS
Fire life safety final inspection passed, one missing fire extinguisher at the mezzanine level provided while on site, temp building address numbers posted per request, project related FIR permits are finaled.
FIR09-00133 INSP-Final Inspection5/28/20095/29/20095/29/2009 1:50:16 PMAPASS
Verified a listed air maintenance device has been installed, fire sprinkler permit approved for final.
BLD09-00781 FIRE-Final Inspection5/28/20095/29/20095/29/2009 1:49:01 PMAPASS
Noted two items to be completed prior to structural final including post the max. occupant load sign per review notes at 66 and provide approved door hardware at the mens restroom per discussion. Also noted building is not fire sprinklered as indicated on review. Remainder of life safety items okayed.
FIR09-00106 INSP-Final Inspection5/28/20095/29/20095/29/2009 1:43:41 PMAPASS
Verified plan resubmittals, noted corrections are finished, fire sprinkler permit finaled.