Inspections for the day of: Tuesday, May 29, 2012.
Number of inspections: 8
Percentage of inspections complete: 88 %
Percentage of inspections not complete: 13 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC12-00147 General Inspection5/25/20125/25/2012   
BLD12-00761 BLD-Framing/Rough-in5/29/20125/29/20125/29/2012 3:39:50 PMPPART
dave Phone #: ###-####
Shear OK South wall only.
BLD12-00973 BLD-Framing/Rough-in5/29/20125/29/20125/29/2012 3:34:11 PMPPART
Randy Phone #: ###-####
Framing OK......I told Randy to not cover until he gets an Electrical R/I insp.
BLD12-00123 BLD-Energy code compliance5/29/20125/29/20125/29/2012 3:28:18 PMPPASS
Reggie Phone #: ###-####
BLD12-01251 BLD-Framing/Rough-in5/29/20125/29/20125/29/2012 2:38:46 PMPPASS
Ron Phone #: ###-####
GCB12-00009 GCB-Framing5/25/20125/29/20125/29/2012 1:41:05 PMAPART
Dave @ ###-####
OK with framing except.....Talked to Dave about some walls removed in rooms 137, 138 and 139.........and door filled in (same area). Architect to contact Sam Z. at plan check To verify if re-submittal needed for approval. Engineer to provide paperwork for wire supports at interior soffit .....Front entry to the South. OK to start insulating.
MIS12-00138 BLD-Conference5/25/20125/29/20125/29/2012 12:08:55 PMAFAIL
HCD inspection//Kevin Brown (call Roxanne at HCD with results at ###-#### xt. 104) Phone #: ###-####
Corrections.....Verify GFCI's, Garage/house separation...Install 1/2" sheetrock lid at attic access. Remove vent at ceiling by furnace and install sheetrock patch or lap and cover hole. Install hard wire smoke Det. and CO2.
GCB12-00017 GCB-Energy5/25/20125/29/20125/29/2012 12:01:29 PMAPASS
Kevin @ ###-####