Inspections for the day of: Wednesday, May 29, 2013.
Number of inspections: 4
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorKimberly M. Johnson
TitleEROSION CONTROL
Phone #208-794-3958
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC12-00290 Aging Inspection5/29/20135/29/20135/29/2013 7:12:47 AM CANC
See last inspection under seperate permit number
ESC12-00366 Aging Inspection5/29/20135/29/20135/29/2013 7:12:35 AM CANC
See last inspection under seperate permit number
ESC12-00367 Aging Inspection5/29/20135/29/20135/29/2013 7:12:20 AM CANC
See last inspection under seperate permit number
ESC13-00339 Conference5/29/20135/29/20135/29/2013 12:00:00 AMPDONE
Project owner/applicant and I met. RP cancelled. Told owner that we need to reschedule for a date and time when the RP and owner can both be present. Reviewed site plan and options for compliance with owner. Owner committed to following phasing plan to bring himself back into compliance. I conducted an early site prep inspection during the conference in anticipation of phase I work beginning. The silt fence needs properly trenched in and extended along entire northerrn perimeter and the DI inlet protection needs installed. I advised him of the need to file the NOI and the 14 day waiting period. Owner will work with engineer to see if he can qualify for a LEW by shortening his construction schedule. Prior to the SWO being lifted, the pre-construction meeting with both the RP and owner must occur and the site must pass the phase I site inspeciton.