ESC12-00290
| Aging Inspection | 5/29/2013 | 5/29/2013 | 5/29/2013 7:12:47 AM | | CANC |
|
|
See last inspection under seperate permit number
|
ESC12-00366
| Aging Inspection | 5/29/2013 | 5/29/2013 | 5/29/2013 7:12:35 AM | | CANC |
|
|
See last inspection under seperate permit number
|
ESC12-00367
| Aging Inspection | 5/29/2013 | 5/29/2013 | 5/29/2013 7:12:20 AM | | CANC |
|
|
See last inspection under seperate permit number
|
ESC13-00339
| Conference | 5/29/2013 | 5/29/2013 | 5/29/2013 12:00:00 AM | P | DONE |
|
|
Project owner/applicant and I met. RP cancelled. Told owner that we need to reschedule for a date and time when the RP and owner can both be present. Reviewed site plan and options for compliance with owner. Owner committed to following phasing plan to bring himself back into compliance. I conducted an early site prep inspection during the conference in anticipation of phase I work beginning. The silt fence needs properly trenched in and extended along entire northerrn perimeter and the DI inlet protection needs installed. I advised him of the need to file the NOI and the 14 day waiting period. Owner will work with engineer to see if he can qualify for a LEW by shortening his construction schedule. Prior to the SWO being lifted, the pre-construction meeting with both the RP and owner must occur and the site must pass the phase I site inspeciton.
|