BLD14-00342
| FIRE-Conference | 5/29/2014 | 5/29/2014 | 5/29/2014 4:46:50 PM | P | DONE |
|
|
Discussion with contractor regarding fire sprinkler work, existing cooking hood, scope of remodel, etc.
|
BLD14-00370
| FIRE-Final Inspection | 5/28/2014 | 5/29/2014 | 5/29/2014 4:39:27 PM | P | PASS |
|
|
Fire life safety inspection completed acceptable.
|
FIR14-00251
| INSP-Final Inspection | 5/29/2014 | 5/29/2014 | 5/29/2014 4:38:31 PM | P | PASS |
|
|
Fire sprinkler permit approved for final once escutcheons are installed.
|
BLD14-01049
| FIRE-Conference | 5/29/2014 | 5/29/2014 | 5/29/2014 4:36:15 PM | P | DONE |
|
|
On site conference regarding exit sign locations.
|
BLD14-01077
| FIRE-Final Inspection | 5/28/2014 | 5/29/2014 | 5/29/2014 2:06:50 PM | A | PASS |
|
|
Life safety final approved.
|
FIR14-00239
| INSP-Sprinkler Rough-in | 5/28/2014 | 5/29/2014 | 5/29/2014 1:32:05 PM | A | PART |
|
|
Overhead fire sprinkler modifications at the remodel area passed rough-in. Need to re-insulate for cold cavity protection as discussed prior to final.
|
FIR13-00608
| INSP-Sprinkler Rough-in | 5/28/2014 | 5/29/2014 | 5/29/2014 11:40:10 AM | A | PART |
|
|
Field modifications at the 5th floor "staging 612" room passed rough-in, and are approved for cover pending changes included on record drawings.
|
FIR14-00241
| INSP-Sprinkler Rough-in | 5/28/2014 | 5/29/2014 | 5/29/2014 10:52:41 AM | A | PART |
|
|
Plaza grille area tie-ins and head changes at the south end passed inspection. Rough-in okayed.
|
FIR13-00440
| INSP-Sprinkler Rough-in | 5/28/2014 | 5/29/2014 | 5/29/2014 10:49:20 AM | A | PART |
|
|
Basement level elevator lobby grid ceiling as marked and dated on approved plans okayed for cover.
|
BLD14-01048
| FIRE-Conference | 5/28/2014 | 5/29/2014 | 5/29/2014 10:48:05 AM | A | DONE |
|
|
On site conference regarding new and existing exit sign locations.
|