FIR14-00603
| INSP-Sprinkler Rough-in/Hydro | 5/29/2015 | 5/29/2015 | 5/29/2015 1:29:11 PM | P | PART |
|
|
Rough to cover inspection for two (2) dry pipe systems protecting two halves of the parking garage. PASSED - OK to cover.
|
FIR15-00096
| INSP-Sprinkler Rough-in | 5/28/2015 | 5/29/2015 | 5/29/2015 12:15:42 PM | A | PART |
|
|
3rd fllor west units for insulation inspection - units # 321 thru 339, and unit 340 and 341. Also stait lobbies at stait C & stair C - 3rd floor. All passed after a few adjustments made during the inspection.
|
FIR13-00167
| INSP-Sprinkler Rough-in | 5/28/2015 | 5/29/2015 | 5/29/2015 12:12:45 PM | A | PASS |
|
|
FSUG flush of the 9th street feed main from city connection to parking garage bulk feed main (just before pump connection) - flushed clear after 2 attempts.
|
FIR14-00478
| INSP-Sprinkler Rough-in | 5/28/2015 | 5/29/2015 | 5/29/2015 8:16:23 AM | A | CANC |
|
|
This is a rough to cover inspection for the parking garage. The contact is Mark. Thanks! Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|