BLD1056419
| INSP - Conference | 5/3/1996 | 5/3/1996 | 5/3/1996 12:00:00 AM | | PASS |
|
|
/ / 301 - WENT OVER REQUIRMENTS TO FINAL OUT PROJECT WITH ALL INSP.
|
BLD95-01852
| INSP - Framing/Rough-in | 5/3/1996 | 5/3/1996 | 5/3/1996 12:00:00 AM | | PASS |
|
|
/ / 301 - FRAM-OK FRAMING VERIFIED ENG. SPANS TO CALULATIONS SUBMITED ARCH. PRINT DEMITIONED CORLECTY.
|
BLD95-02246
| INSP - Conference | 5/3/1996 | 5/3/1996 | 5/3/1996 12:00:00 AM | | PASS |
|
|
/ / 301 - WIP -WORK IN PROGRESS
|
BLD96-00011
| INSP - Conference | 5/3/1996 | 5/3/1996 | 5/3/1996 12:00:00 AM | | PASS |
|
|
/ / 301 - RECIEVED RESUBMITAL AND ROUTED TO PLAN REVIEW AND FIRE DEPT.
|
BLD96-00634
| INSP - Energy code compliance | 5/3/1996 | 5/3/1996 | 5/3/1996 12:00:00 AM | | PASS |
|
|
/ / 301 - INSL-OK INSULATION-ENERGY CODE
|
BLD96-00757
| INSP - Footings | 5/3/1996 | 5/3/1996 | 5/3/1996 12:00:00 AM | | PASS |
|
|
/ / 301 - FTG -OK FOOTING
|
BLD96-00829
| INSP - Footings | 5/3/1996 | 5/3/1996 | 5/3/1996 12:00:00 AM | | PASS |
|
|
/ / 301 - EAR-EARLY START POURED WITHOUT INSPECTION STBK-OK SETBACKS
|
BLD96-00191
| INSP - Framing/Rough-in | 5/2/1996 | 5/3/1996 | 5/3/1996 12:00:00 AM | A | PASS |
|
|
05/02/96 301 - A.M. EARLY FRAM-OK FRAMING GWB -OK SHEETROCK NAILING TOP OF CORRIDOR LID.
|
BLD96-00524
| INSP - Framing/Rough-in | 5/2/1996 | 5/3/1996 | 5/3/1996 12:00:00 AM | A | FAIL |
|
|
05/02/96 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
BLD95-02260
| INSP - Final | 5/2/1996 | 5/3/1996 | 5/3/1996 12:00:00 AM | A | FAIL |
|
|
05/02/96 301 - DICK GAVE THEM THE GO AHEAD TO MOVE THE FURNITURE IN..DIX CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
BLD95-02017
| INSP - Final | 5/2/1996 | 5/3/1996 | 5/3/1996 12:00:00 AM | A | FAIL |
|
|
05/02/96 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
BLD95-02230
| INSP - Final | 5/2/1996 | 5/3/1996 | 5/3/1996 12:00:00 AM | A | FAIL |
|
|
05/02/96 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|