BLD01-00452
| BLD-Framing/Rough-in | 5/2/2001 | 5/3/2001 | 5/3/2001 12:00:00 AM | A | PART |
|
|
###-#### please call 15 minutes before you go out ok to cover bar soffit, kitchen side floors; eng'r to ok beam fix in writing 5/3/2001 12:24:07 PM
|
BLD00-03659
| BLD-Conference | 5/3/2001 | 5/3/2001 | 5/3/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 340 On 5/3/2001 9:21:44 AM w/ bldr, Bob Cafferty...awaiting appropriate resubmittal.
|
BLD99-02195
| BLD-Conference | 5/3/2001 | 5/3/2001 | 5/3/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 340 On 5/3/2001 9:39:20 AM w/ Mark..need eng's & spec insp's reports
|
BLD00-02394
| BLD-Foundation | 5/1/2001 | 5/3/2001 | 5/3/2001 12:00:00 AM | A | PART |
|
|
concrete ###-#### they are pouring at 7am ok to pour parapet, pend report. 5/3/2001 11:57:04 AM
|
BLD99-02195
| BLD-Final | 5/2/2001 | 5/3/2001 | 5/3/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 05/02/2001 at 12:01:05. Contact: ###-####...need all "final" docume 5/3/2001 4:53:22 PM ts, includingcivil eng's letter. 5/3/2001 4:53:32 PM 5/3/2001 4:54:21 PM
|
BLD01-00246
| BLD-Conference | 5/3/2001 | 5/3/2001 | 5/3/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 5/3/2001 12:09:38 PM w/408 re c/n
|
BLD01-00106
| BLD-Footing | 5/3/2001 | 5/3/2001 | 5/3/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 5/3/2001 12:14:57 PM elev shaft wall & perim ftgs at bsmt..ok pend soils report & clarification of design values (2500 psi design?) pour at own risk.
|
BLD00-03538
| BLD-Concrete | 5/3/2001 | 5/3/2001 | 5/3/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 5/3/2001 2:00:17 PM col's at S.E. corner...appear ok, pending insp reports.
|
BLD99-03383
| BLD-Framing/Rough-in | 5/3/2001 | 5/3/2001 | 5/3/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 5/3/2001 4:52:54 PM curtain wall firestops at fls.2,3,4,5 appear ok...mti also inspecting
|
BLD00-02123
| BLD-Conference | 5/3/2001 | 5/3/2001 | 5/3/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 5/3/2001 5:28:11 PM w/ owner...get plbg, elec r/i's. ok to roof
|
BLD01-00141
| BLD-Final | 5/3/2001 | 5/3/2001 | 5/3/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 05/03/2001 at 07:35:02. Contact: ###-####....cdhd ok per Marlene...ok for l/c 5/3/2001 2:17:08 PM
|
BLD00-02123
| BLD-Final | 5/3/2001 | 5/3/2001 | 5/3/2001 12:00:00 AM | P | NR |
|
|
Steven ###-####
|
BLD01-00097
| BLD-Final | 5/3/2001 | 5/3/2001 | 5/3/2001 12:00:00 AM | P | PASS |
|
|
Don, ###-####...ok for c/o 5/3/2001 1:53:46 PM
|
BLD01-00106
| BLD-Footing | 5/2/2001 | 5/3/2001 | 5/2/2001 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 05/02/2001 at 14:46:38. Contact: ###-####.--per pat cancel rescheduled/mls
|