PLM00-04120
| Final | 5/2/2001 | 5/3/2001 | 5/3/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
PLM01-00285
| Final | 5/2/2001 | 5/3/2001 | 5/3/2001 12:00:00 AM | A | PART |
|
|
###-#### need to run water heater t / p and water heater drain pan lines out separate to outside of building 5/3/2001 11:14:27 AM
|
PLM01-00312
| Final | 5/2/2001 | 5/3/2001 | 5/3/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/02/2001 at 16:16:02. Contact: ###-####.
|
PLM01-01078
| Plumbing Rough-in | 5/2/2001 | 5/3/2001 | 5/3/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/02/2001 at 17:19:13. Contact: ###-####.
|
PLM01-01387
| Plumbing Rough-in | 5/3/2001 | 5/3/2001 | 5/3/2001 12:00:00 AM | P | PART |
|
|
###-#### need to move pex piping from water heater flue will need to install RPBA on potable water to steam unit for final inspection ok to cover over head plumbing test ok 5/3/2001 3:33:09 PM
|
PLM01-01391
| Sprinkler (Final) | 5/3/2001 | 5/3/2001 | 5/3/2001 12:00:00 AM | P | PASS |
|
|
###-####
|
PLM01-01378
| Sprinkler (Final) | 5/3/2001 | 5/3/2001 | 5/3/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 360 On 5/3/2001 2:20:40 PM
|