FIR01-00267
| INSP-Sprinkler Rough-in/Hydro | 5/2/2001 | 5/3/2001 | 5/3/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/02/2001 at 15:34:58. Contact: ###-####. oka 5/3/2001 10:20:12 AM y 5/3/2001 10:20:15 AM okay to cover 5/3/2001 10:20:30 AM
|
BLD00-02884
| FIRE-Sprinkler Rough-in | 5/3/2001 | 5/3/2001 | 5/3/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 409 On 5/3/2001 10:19:47 AM okay to cover
|
BLD00-02595
| FIRE-Final Inspection | 5/3/2001 | 5/3/2001 | 5/3/2001 12:00:00 AM | P | PASS |
|
|
1-###-####
|
FIR00-00627
| INSP-Final Inspection | 5/3/2001 | 5/3/2001 | 5/3/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 05/03/2001 at 08:41:54. Contact: ###-####. okay on aerosol racking 5/3/2001 2:49:07 PM
|
FIR01-00267
| INSP-Sprinkler Rough-in/Hydro | 5/2/2001 | 5/3/2001 | 5/2/2001 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 05/02/2001 at 13:53:09. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 05/02/2001 at 15:33:53.
|